USPTO serial 90056404
INNOVATION APPLIED. PERFORMANCE DELIVERED.
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Jun 20, 2023
- Examiner
- SPARACINO, MARK V
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with INNOVATION APPLIED. PERFORMANCE DELIVERED.?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Catherine H. Stockell
Catherine H. Stockell FISH & RICHARDSON P.C.P.O. BOX 1022MINNEAPOLIS, MN 55440-1022UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 001 | Chemicals used in industry and scientific research; chemicals and chemical preparations used in the petrochemical industry; catalysts for petrochemical processes; catalysts for use in the manufacture of synthetics, rubbers and polymers; catalysts for use in the production of polyolefins | ACTIVE | — |
| 042 | Engineering services; engineering services in the field of chemical, petrochemical, petroleum refining, plastic, and coal processing industries; engineering services, namely, design of technology for the processing of oils, gases, hydrocarbons, fuels, and petrochemicals; scientific and industrial research in the field of processing of oils, gases, hydrocarbons, fuels, and petrochemicals; scientific research and development in the field of processing of oils, gases, hydrocarbons, fuels, and petrochemicals; designing and planning of oil refineries and chemical, petrochemical, oil, natural gas, gas, and other process and industrial plants and facilities; materials testing services, chemical analysis services, scientific laboratory and chemical laboratory services, and analytical chemical services, all offered in connection with oil refineries and chemical, petrochemical, oil, natural gas, gas, oil refinery, and other process and industrial plants and facilities in the chemical, petrochemical, petroleum refining, plastic, and coal processing industries; consultancy and advisory services in the field of chemical process development; consultancy and advisory services, namely, designing and developing oil refineries, and chemical, petrochemical, oil, gas, natural gas, oil refinery, and other process and industrial plants and equipment therefor; research, analysis, and quality evaluation services for others in the field of processing of oils, gases, hydrocarbons, and petrochemicals; scientific consulting, material testing, design of machinery and equipment for others, engineering services, chemical process development for others, technical assistance in the nature of advice, information and consultancy in relation to processing of oils, gases, hydrocarbons, fuels, and petrochemicals, and scientific laboratory services in the chemical, petrochemical, petroleum refining, plastic, synthetic natural gas, and coal processing industries; initial start-up and initial operations support services, namely, diagnostic, testing, technological troubleshooting, evaluating, and analyzing of equipment used by oil refineries and chemical, petrochemical, oil, natural gas, gas, oil refinery, and other process and industrial plants and facilities in the chemical, petrochemical, petroleum refining, plastic, and coal processing industries; technical support in the nature of technical advisory services relating to the manufacture of synthetics, rubbers and polymers; consulting services in the field engineering of oil refineries and chemical, petrochemical, oil, natural gas, gas, plastic, and coal processing plants, oil refinery plants, and other process and industrial plants, and associated equipment and facilities; technical consulting services in the field of the designing the manufacture and configuration of polyolefin production systems | ACTIVE | Jul 17, 2020 |
| 045 | Licensing of oil refining and petrochemical technologies; consultation services in the field of the licensing of oil refining and petrochemical technology; licensing of technologies for the manufacture and configuration of polyolefin production systems; licensing of specialized equipment and chemical and petrochemical processes to third party oil refineries and chemical, petrochemical, oil, gas, natural gas, and other process and industrial plants and facilities; licensing services, namely, licensing and assisting others in the licensing of rights to equipment and industrial, refining and chemical processes for use in third party oil refineries and chemical, petrochemical, oil, gas, natural gas, and other process and industrial plants and facilities; licensing of intellectual property | ACTIVE | Jul 17, 2020 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Lummus Technology LLC
- Other trademarks owned by Lummus Technology LLC
- Other trademarks owned by Lummus Technology LLC
- Other trademarks in Class 001
- Other trademarks in Class 042
- Other trademarks in Class 045
- Similar marks named INNOVATION APPLIED. PERFORMANCE DELIVERED.
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 20, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jun 20, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 18, 2023 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| May 17, 2023 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| May 16, 2023 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| May 16, 2023 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Apr 27, 2023 | IUAF | USE AMENDMENT FILED | — |
| Apr 27, 2023 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Oct 29, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Oct 27, 2022 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Oct 27, 2022 | EXT3 | SOU EXTENSION 3 FILED | — |
| Oct 27, 2022 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Apr 29, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Apr 27, 2022 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Apr 27, 2022 | EXT2 | SOU EXTENSION 2 FILED | — |
| Apr 27, 2022 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Oct 29, 2021 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Oct 27, 2021 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Oct 27, 2021 | EXT1 | SOU EXTENSION 1 FILED | — |
| Oct 27, 2021 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Apr 27, 2021 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Mar 2, 2021 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 2, 2021 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Feb 10, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jan 29, 2021 | APET | ASSIGNED TO PETITION STAFF | — |
| Jan 22, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 12, 2021 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 30, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 30, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 30, 2020 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 5, 2020 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 5, 2020 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 5, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 29, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 13, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 20, 2020 | NWAP | NEW APPLICATION ENTERED | — |