USPTO serial 90099692
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Allied Tube & Conduit Corporation
Harvey, IL
Allied Tube & Conduit Corporation
Harvey, IL
Allied Tube & Conduit Corporation
Harvey, IL
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Karen Feisthamel
Karen Feisthamel KDW Firm PLLC2601 Weston Parkway, Suite 103CARY, NC 27513United States| Class | Description | Status | First use |
|---|---|---|---|
| 002 | Protective barrier applied to pipes, namely bacterial and corrosion inhibitants in the nature of a coating | ACTIVE | Aug 30, 2020 |
| 006 | Metal building materials, namely metal cable trays used in building construction; metal cable tray systems used in building construction; metal pipes; metal welded pipe fittings; razor wire; metal fencing; metal fencing framework; metal posts; metal sign posts; metal conduits; metal tubing; metal pipe fittings and metal pipe connectors; metal structural tubing; metal framing, namely, building wall and ceiling framing made primarily of metal; metal caging, namely, metal telecom security caging; metal roll form shapes for or in the nature of structural channels, angles and tubes; metal channels, namely, metal structural channel members for structural supports and framing; construction elements made of metal, namely, support struts, support channels; metal strut channels; metal building wall framing systems made primarily of metal; metal ceiling grids; space frame systems, namely, framing systems for buildings using three-dimensional trusses made of metal; prefabricated building walls and roofs made primarily of metal; metal angles for construction, namely, metal structural angle for structural supports and framing; metal roof and floor trusses; steel sheets and plates | ACTIVE | Aug 30, 2020 |
| 009 | Electrical components and materials, namely electrical cable; armored fiber optics; sprinkler pipes for fire suppression; plastic and PVC conduits for use in electrical installations; metal cable protection materials, namely, electric cable sheathing; electrical wires; electrical whips and wiring components, namely, flexible wiring cables and connectors; pre-wired electrical power distribution panels; pre-wired electrical A/V distribution boxes; electrical power distribution systems, namely, electrical distribution boxes and electrical modular wiring; temporary electric lighting, namely, portable lighting for use at residential and commercial construction sites for safety purposes; construction safety systems, namely, safety lines, connectors, fasteners and hangers, safety harnesses, and safety cables; non-metal cable protection materials, namely non-metal sheathing for electric cables | ACTIVE | Aug 30, 2020 |
| 011 | Lighting components and materials, namely modular lighting systems comprised of flat lighting panels, modular electrical wiring, electric switches, and phase selectors; temporary electrical lighting for use for use at residential and commercial construction sites in the nature of lamps, flood lights, lights of outdoor use and lighting fixtures | ACTIVE | Aug 30, 2020 |
| 017 | Non-metal flexible pipes; non-metal pipe fittings; non-metal pipe connectors, in the nature of couplers, joints and seals | ACTIVE | Aug 30, 2020 |
| 019 | Non-metal building materials, namely non-metal cable trays used in building construction; non-metal cable tray systems used in building construction; non-metal rigid pipes; non-metal fencing; fiberglass channels, namely, structural channel profiles for use in building construction; fiberglass building framing systems; roof walk systems, namely, non-metal structure for walking over roofs of facilities | ACTIVE | Aug 30, 2020 |
| 037 | Building construction services in the nature of construction of support systems for healthcare facilities, commercial structures, high-tech structures; consultation regarding construction of support systems for healthcare facilities, commercial structures, high-tech structures | ACTIVE | Aug 30, 2020 |
| 040 | Fabrication services, in the nature of custom fabrication of fire sprinklers; custom metal fabrication of building framing structures; steel coil processing, namely, forming, cutting and pickling; custom fabrication of tube and pipe for others | ACTIVE | Aug 30, 2020 |
| 042 | Design and engineering services, in the nature of building structural design and engineering services | ACTIVE | Aug 30, 2020 |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 8, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Oct 8, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 1, 2024 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Sep 1, 2024 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Jul 5, 2024 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Jul 5, 2024 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| May 28, 2024 | IUAF | USE AMENDMENT FILED | — |
| May 28, 2024 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Mar 1, 2024 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 29, 2024 | EX5G | SOU EXTENSION 5 GRANTED | — |
| Feb 29, 2024 | EXT5 | SOU EXTENSION 5 FILED | — |
| Feb 29, 2024 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Sep 1, 2023 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Aug 30, 2023 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Aug 30, 2023 | EXT4 | SOU EXTENSION 4 FILED | — |
| Aug 30, 2023 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Feb 24, 2023 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 22, 2023 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Feb 22, 2023 | EXT3 | SOU EXTENSION 3 FILED | — |
| Feb 22, 2023 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Sep 1, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Aug 30, 2022 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Aug 30, 2022 | EXT2 | SOU EXTENSION 2 FILED | — |
| Aug 30, 2022 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Mar 2, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 28, 2022 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Feb 28, 2022 | EXT1 | SOU EXTENSION 1 FILED | — |
| Feb 28, 2022 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Nov 22, 2021 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Nov 22, 2021 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 22, 2021 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Nov 22, 2021 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Nov 22, 2021 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 22, 2021 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Aug 31, 2021 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jul 6, 2021 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jul 6, 2021 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 16, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jun 3, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 2, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 2, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 2, 2021 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 2, 2020 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 2, 2020 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 2, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 2, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 9, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 11, 2020 | NWAP | NEW APPLICATION ENTERED | — |