USPTO serial 90109221
PRECISION INTEGRATED SUBSURFACE UTILITY MAPPING
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Dec 27, 2022
- Examiner
- BERTRAND, JOSEPH A
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with PRECISION INTEGRATED SUBSURFACE UTILITY MAPPING?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Gregory C. Golla
Gregory C. Golla MERCHANT & GOULD P.C.P.O. BOX 2910MINNEAPOLIS, MN 55402-0910UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Downloadable computer software and application software for underground mapping and 3D subsurface utility mapping; probes for scientific use, probing devices, apparatus and installations used for the generation of maps of existing and new underground and surface infrastructures and networks of pipes, cables, pipelines, namely, gyroscope based inertial measurement probe designed to map utility networks for pipeline mapping system, hydro runner system, conduits runner system and trajectories runner system adapted for a wide range of pipe and conduit diameters, passing bends and obstacles and operating in a variety of pipe and conduit materials at different stages of aging; gyroscope based inertial measurement probe and wheels sold as a unit, designed to map utility networks for pipeline mapping system, hydro runner system, conduits runner system and trajectories runner system adapted for a wide range of pipe and conduit diameters, passing bends and obstacles and operating in a variety of pipe and conduit materials at different stages of aging | ACTIVE | Oct 12, 2022 |
| 042 | Providing temporary use of non-downloadable cloud computing software for underground mapping and 3D subsurface utility mapping; design and development of computer programs and software and related consulting services for underground mapping and 3D subsurface utility mapping | ACTIVE | Apr 11, 2022 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by CONDUX INTERNATIONAL, INC.
- Other trademarks owned by CONDUX INTERNATIONAL, INC.
- Other trademarks owned by CONDUX INTERNATIONAL, INC.
- Other trademarks in Class 009
- Other trademarks in Class 042
- Similar marks named PRECISION INTEGRATED SUBSURFACE UTILITY MAPPING
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Dec 27, 2022 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Dec 27, 2022 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 22, 2022 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Nov 21, 2022 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Nov 7, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 1, 2022 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Nov 1, 2022 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Oct 14, 2022 | IUAF | USE AMENDMENT FILED | — |
| Oct 14, 2022 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Apr 6, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Apr 4, 2022 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Apr 4, 2022 | EXT1 | SOU EXTENSION 1 FILED | — |
| Apr 4, 2022 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Oct 19, 2021 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Aug 24, 2021 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Aug 24, 2021 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 4, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 19, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 19, 2021 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jul 19, 2021 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jul 19, 2021 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jul 19, 2021 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jun 8, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 7, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 7, 2021 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 10, 2020 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 10, 2020 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 10, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 7, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 15, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 15, 2020 | NWAP | NEW APPLICATION ENTERED | — |