Drawing for ECOKIT USA

USPTO serial 90169260

ECOKIT USA

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
XU, ELAINE YILIN
Law office
TMO LAW OFFICE 127

What this means

These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 602: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with ECOKIT USA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
037Construction and installation of masonry walls and structures; Construction and renovation of buildings; Construction and repair of buildings; Construction consultancy; Construction consultation; Construction grading services; Construction management; Construction of airports; Construction of buildings; Construction of civil engineering structures; Construction of medical establishments; Construction of modular buildings; Construction of modular homes; Construction planning; Construction project management services; Construction services, namely, installation of environmental containment systems; Construction services, namely, planning, laying out and construction of a planned residential community; Construction services, namely, planning, laying out and construction of residential and commercial communities; Construction services, namely, planning, laying out and custom construction of residential and commercial communities; Construction services, namely, planning, laying out and custom construction of commercial buildings; Construction supervision; Construction, maintenance and renovation of real property; Advisory services relating to building construction; Advisory services relating to the construction of buildings; Building construction; Building construction and repair; Building construction information; Building construction services; Building construction supervision; Building construction, remodeling and repair; Commercial building construction; Consultancy relating to residential and building construction; Consultancy services relating to the construction of buildings; Consultation in building construction supervision; Consultation in the field of construction and building of horse-riding arenas; Consultation services in the field of construction of environmentally-conscious buildings; Consulting in the field of hospital construction; Consulting services for the construction and installation of masonry walls and structures; Consulting services in the field of construction of wind energy facilities; Custom construction of homes; Custom building construction; Factory construction; General construction contracting; Harbor construction; Installation of utilities in construction sites; Marine construction; Pier construction; Provision of technical information in the field of building construction; Residential and building construction consulting; Residential and commercial building construction; Residential building construction; Steel structure construction works; Street construction; Warehouse construction and repairACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB2): The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.

DateCodeEventWhat it means
Jul 30, 2021MAB2ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Jul 30, 2021ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Jan 16, 2021GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 16, 2021GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 16, 2021CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 16, 2021DOCKASSIGNED TO EXAMINER—
Oct 15, 2020NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 12, 2020NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance