Drawing for ARCTEVITY

USPTO serial 90250724

ARCTEVITY

Reviewed by CopyMark Law Group

Reg. 7139589Status 700Registered
Filing date
Status date
Registration date
Aug 15, 2023
Examiner
MACFARLANE, JAMES W
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with ARCTEVITY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Matthew Saunders

Matthew Saunders SAUNDERS & SILVERSTEIN LLP14 CEDAR STREET SUITE 224AMESBURY, MA 01913UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009Building control and management systems comprising wireless electronic controllers and wired electronic controllers, controlled devices consisting of lighting, climate control, heating and cooling, air quality monitors and sensors, alarms and other safety equipment, locks, doorbells, cameras, and security monitoring equipment, and downloadable software for lighting, security, safety, climate control, and other home and office monitoring and control applications; Building control and management systems comprising electronic occupancy, motion, temperature, humidity, air quality, and photoelectric sensors, electronic data relays for sensors, electronic programmable logic controllers, analog and digital input and output modules, and downloadable computer software for providing awareness of building operating conditions; Electric and electronic apparatus and instruments, namely, connecting devices for connecting communication and computer networks in the nature of computer network switches, communication and computer network hubs, and communication and computer network access points for connecting computer and control devices; Lighting control apparatus; Light switches; Electric light dimmers; Microprocessors; Control modules being electronic programmable logic controllers for building control and management systems; Electric relays; Occupancy sensors, namely, electronic devices that detect the presence of occupants and control lighting and HVAC systems accordingly; Motion, temperature, humidity, air quality, and photoelectric sensorsACTIVEAug 2, 2021
042Non-downloadable cloud-based software for configuration, operation, monitoring, analysis, and control of building control systems, building management systems, and intelligent building systems, namely, software for configuration, operation, monitoring, analysis, and control of lighting, climate control, heating and cooling, air quality monitors and sensors, alarms and other safety equipment, locks, doorbells, cameras, and security monitoring equipmentACTIVEAug 2, 2021

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 15, 2023NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Aug 15, 2023R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 14, 2023SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Jul 13, 2023CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Jun 13, 2023SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Jun 7, 2023AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
May 16, 2023IUAFUSE AMENDMENT FILED—
May 16, 2023EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Mar 16, 2023CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Mar 16, 2023TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Mar 16, 2023COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Nov 5, 2022EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Nov 3, 2022EX3GSOU EXTENSION 3 GRANTED—
Nov 3, 2022EXT3SOU EXTENSION 3 FILED—
Nov 3, 2022EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jun 17, 2022EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jun 15, 2022EX2GSOU EXTENSION 2 GRANTED—
Jun 15, 2022EXT2SOU EXTENSION 2 FILED—
Jun 15, 2022EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Dec 11, 2021EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Dec 9, 2021EX1GSOU EXTENSION 1 GRANTED—
Dec 9, 2021EXT1SOU EXTENSION 1 FILED—
Dec 9, 2021EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jun 22, 2021NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Apr 27, 2021NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 27, 2021PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 7, 2021NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 24, 2021CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 24, 2021XAECEXAMINER'S AMENDMENT ENTERED—
Mar 24, 2021GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Mar 24, 2021GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 24, 2021CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 12, 2021DOCKASSIGNED TO EXAMINER—
Dec 1, 2020NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 18, 2020ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Oct 16, 2020NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance