Drawing for SUNLAND RENEWABLE ENERGY

USPTO serial 90280851

SUNLAND RENEWABLE ENERGY

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
SETTLES LEWIS, SHAILA E
Law office
TMO LAW OFFICE 114 - EXAMINING ATTORNEY ASSIGNED

What this means

These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 600: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with SUNLAND RENEWABLE ENERGY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Ian C. Barras

Ian C. Barras Sughrue Mion, PLLC2000 Pennsylvania Ave. NWSUITE 9000Washington, DC 20006

Goods and services

ClassDescriptionStatusFirst use
037Civil construction services in the field of renewable energy, namely, construction of foundations, construction and installation of steel or concrete platforms to support solar or wind power equipment, installation of generation and power storage equipment, site layout, staking of construction limits, marking of underground hazards, determination of excavation and fill depths, benchmark location and installation, location of appurtenances, setting piles, laying foundations, ripping of concrete or other materials, excavation, cut and fill operations, backfilling, grading, rock filling, de-compaction, compaction, seeding, site stabilization, installation of geomembranes, construction and installation of drainage, construction and installation of culverts, construction and installation of concrete, placement of rip-rap, construction of roadways, placement of gravel, dewatering of sites, shoring and slope stabilization, matting, earthwork, construction and installation of trench boxes, construction and installation of sheet pile boxes, hydro-excavation, installation of silt fencing, installation of hay bale water control and filtering, construction and installation of slabs, construction and installation of sidewalks, construction and installation of stair landings, installation and placement of rebar, construction and installation of forms, construction and installation of anchors, construction and installation of steel and/or concrete platforms, concrete articulating mat installation and removal; construction of renewable energy power stations; construction and installation of wind generation facilities and equipment; concrete paving, site clearing, excavation, pad preparation, grading, and asphalt paving services; building construction services; earthworks services in the nature of excavating for building construction; plant construction, maintenance and construction project management services for businesses in the energy production and transmission sector; installation of renewable energy generation equipment; repair and installation services in the field of renewable energy, namely, repair and installation of foundations, steel or concrete platforms to support solar or wind power equipment, generation and power storage equipment; inspection services in the course of construction of renewable energy facilities; construction project management services in the field of construction of renewable energy and energy generation equipment support structures and ancillary structures; consulting services in the field of construction of wind and solar energy facilitiesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 27, 2022MAB0ABANDONMENT NOTICE MAILED - INCOMPLETE RESPONSE—
Dec 26, 2022MAB0ABANDONMENT NOTICE MAILED - INCOMPLETE RESPONSE—
Dec 26, 2022ABN0ABANDONMENT - INCOMPLETE RESPONSE—
Nov 22, 2022CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Nov 22, 2022TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Nov 22, 2022ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 22, 2022REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Nov 22, 2022COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
May 24, 2022RDX3NOTIFICATION FOR REQ FOR RECON DENIED NO APPEAL FILED—
May 24, 2022RDX1ACTION FOR REQ FOR RECON DENIED NO APPEAL FILED E-MAILED—
May 24, 2022RRDXACTION REQ FOR RECON DENIED NO APPEAL FILED COUNTED NOT MAILED—
Apr 23, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 22, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 22, 2022ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Oct 22, 2021GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Oct 22, 2021GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Oct 22, 2021CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Sep 28, 2021TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 27, 2021CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 27, 2021TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 27, 2021GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 27, 2021GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 27, 2021CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 27, 2021DOCKASSIGNED TO EXAMINER—
Dec 18, 2020MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Dec 17, 2020NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 30, 2020NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance