Drawing for PEC SOLUTIONS

USPTO serial 90354165

PEC SOLUTIONS

Reviewed by CopyMark Law Group

Reg. 7058076Status 700Registered
Filing date
Status date
Registration date
May 23, 2023
Examiner
SCHWARZ, KATHLEEN MICHELLE HUD
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with PEC SOLUTIONS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Charlene A. Azema

Charlene A. Azema KNOBBE, MARTENS, OLSON & BEAR, LLP2040 MAIN STREET, 14TH FLOORIRVINE, CA 92614UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
037Installation of data centers; installation of electrical control panels and integration of same into existing electrical equipment; installation, maintenance and repair of electrical machinery, electrical systems, and electrical facilities in the nature of data processing, internet commerce, internet banking, corporate website, internet search, video streaming, internet collocation, social media, distribution, healthcare, industrial, commercial, and renewable energy facilities; installation, and repair of electrified systems, namely, life safety systems in the nature of fire alarm systems, very early smoke detection systems (VESDA), fire pumps, emergency power off systems (EPO), smoke control systems, smoke purge systems, fire suppression systems, emergency power systems, emergency lighting systems, fire sprinkler systems, and mass notification systems, underground and overhead electrical and communication systems, and electrical technologies in the nature of system control and data acquisition (SCADA), electrical power monitoring system (EMPS), building automation management systems (BMS), distributed antenna systems (DAS), wireless internet, and security systems; electrical repairs, maintenance, and installation of electrical wiring, devices in the nature of medium voltage power distribution devices, low voltage power distribution devices, uninterruptible power supply devices, electrical generation devices, power distribution units, remote power panels, rack-mounted power distribution units, electrical bus way, modular plug in bus way, switchgears, switchboards, transformers, panel boards, generators, automatic transfer switches, circuit breakers, protective relays, motors, variable frequency drives, air handling units, building automation system components, fire sprinkler system components, and fire alarm system components, light fixtures, life safety systems in the nature of fire alarm systems, very early smoke detection systems (VESDA), fire pumps, emergency power off systems (EPO), smoke control systems, smoke purge systems, fire suppression systems, emergency power systems, emergency lighting systems, fire sprinkler systems, and mass notification systems, electrical panels and panel assemblies; consulting in the field of installation repair of electrical systems and electrical facilities in the nature of data processing, internet commerce, internet banking, corporate website, internet search, video streaming, internet collocation, social media, distribution, healthcare, industrial, commercial, and renewable energy facilities; installation, and maintenance of audiovisual solutions, low voltage audiovisual solutions, and security systems; field services being maintenance of electrical and industrial control panels; comprehensive preventative maintenance service for electrical systems; installation, maintenance and repair of power lines; laying of cable for electrical systems and network systemsACTIVEAug 1, 2020

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 13, 2024ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
May 23, 2023NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
May 23, 2023R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 20, 2023DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION—
Apr 20, 2023AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Mar 10, 2023IUCNNOTICE OF ALLOWANCE CANCELLED—
Mar 10, 2023EPPATEAS POST PUBLICATION AMENDMENT RECEIVED—
Sep 21, 2022EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Sep 19, 2022EX1GSOU EXTENSION 1 GRANTED—
Sep 19, 2022EXT1SOU EXTENSION 1 FILED—
Sep 19, 2022EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Mar 22, 2022NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jan 25, 2022NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jan 25, 2022PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 5, 2022NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Dec 17, 2021PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Dec 17, 2021CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 17, 2021XAECEXAMINER'S AMENDMENT ENTERED—
Dec 17, 2021GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Dec 17, 2021GNEAEXAMINERS AMENDMENT E-MAILED—
Dec 17, 2021CNEAEXAMINERS AMENDMENT -WRITTEN—
Dec 14, 2021TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 14, 2021CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 2, 2021ALIEASSIGNED TO LIE—
Nov 29, 2021TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 28, 2021AAUANOTICE OF ACCEPTANCE OF AMENDMENT TO ALLEGE USE E-MAILED—
May 27, 2021GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 27, 2021GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 27, 2021CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 27, 2021IUAAUSE AMENDMENT ACCEPTED—
May 20, 2021AUPCAMENDMENT TO USE PROCESSING COMPLETE—
May 20, 2021IUAFUSE AMENDMENT FILED—
May 19, 2021EAAUTEAS AMENDMENT OF USE RECEIVED—
May 19, 2021DOCKASSIGNED TO EXAMINER—
Feb 7, 2021NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 5, 2020NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance