USPTO serial 90449067
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Katherine P. Califa
Katherine P. Califa Foley & Lardner LLP3000 K Street, N.W. Suite 600Washington, DC 20007-5109UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Building construction; construction of buildings; mechanical contractor services; construction services in the field of industrial facilities insulation services, namely, installation, maintenance and removal of thermal and cryogenic insulating materials at refinery, petrochemical and power-generation facilities, and marine and off-shore facilities; construction services in the field of refractory services, namely, installation, repair, and maintenance of refractory linings in high temperature vessels, particularly fluid catalytic cracking units, reformers, hydro crackers, crude units, thermal reactors, boilers, sulfur recovery units, and industrial furnaces; general construction contracting; installation of insulation, cladding and jacketing for boilers, ducting and piping at refinery, petrochemical and power-generation facilities, and marine and offshore facilities; repair and maintenance of building scaffolds, working platforms and building platforms; repair and maintenance of power distribution or control machines and apparatus; construction services, namely, earthwork and site preparation, structural steel installation, installation of piping for industrial purposes, installing mechanical systems, installing electrical systems and instrumentation; construction, maintenance, and renovation of construction project facilities property; custom construction of construction project facilities; providing construction services, namely, building and foundation construction, construction planning, and general construction contracting; construction services, namely, machinery retrofit and conversion services to incorporate new technology into machinery; installation of electrical and generating machinery; remodeling of industrial facilities for the purpose of incorporating new technology therein; construction of facilities and structures in the fields of oil and gas, chemicals, power, mining, and wastewater treatment | ACTIVE | — |
| 040 | Custom manufacture of general product lines in the field of steel pipe and tubing; fireproofing of buildings and machinery | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 11, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jun 11, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 8, 2024 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| May 8, 2024 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Apr 10, 2024 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Apr 9, 2024 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Apr 8, 2024 | IUAF | USE AMENDMENT FILED | — |
| Apr 8, 2024 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Apr 8, 2024 | EX5G | SOU EXTENSION 5 GRANTED | — |
| Apr 8, 2024 | EXT5 | SOU EXTENSION 5 FILED | — |
| Apr 8, 2024 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Sep 13, 2023 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Sep 13, 2023 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Sep 13, 2023 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Aug 31, 2023 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Aug 29, 2023 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Aug 29, 2023 | EXT4 | SOU EXTENSION 4 FILED | — |
| Aug 29, 2023 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Apr 18, 2023 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Apr 18, 2023 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Apr 18, 2023 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 18, 2023 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Apr 18, 2023 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Feb 22, 2023 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 20, 2023 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Feb 20, 2023 | EXT3 | SOU EXTENSION 3 FILED | — |
| Feb 20, 2023 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Oct 14, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Oct 12, 2022 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Oct 12, 2022 | EXT2 | SOU EXTENSION 2 FILED | — |
| Oct 12, 2022 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| May 21, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| May 20, 2022 | EX1G | SOU EXTENSION 1 GRANTED | — |
| May 19, 2022 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Apr 21, 2022 | NREV | NOTICE OF REVIVAL - E-MAILED | — |
| Apr 21, 2022 | TPEX | SOU EXTENSION RECEIVED WITH TEAS PETITION | — |
| Apr 21, 2022 | PETG | PETITION TO REVIVE-GRANTED | — |
| Apr 21, 2022 | PROA | TEAS PETITION TO REVIVE RECEIVED | — |
| Apr 19, 2022 | EXT1 | SOU EXTENSION 1 FILED | — |
| Oct 19, 2021 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Aug 24, 2021 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Aug 24, 2021 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 4, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 17, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 13, 2021 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 4, 2021 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 8, 2021 | NWAP | NEW APPLICATION ENTERED | — |