USPTO serial 90487248
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Cheryl L. Burbach
Cheryl L. Burbach Erise IP, P.A.7015 College Blvd.Suite 700Overland Park, KS 66211| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Metal ramps, metal hooks, metal chains, metal screws and metal wire frame clips to affix wiring to the trailer frame; metal corner brackets being parts for trailer building or repair; for trailers | ACTIVE | — |
| 009 | Break-away kits comprised of a rechargeable battery and battery charger, a break-away power switch, a plastic housing box | ACTIVE | — |
| 012 | Utility trailers; cargo trailers; horse and livestock cargo trailers; and structural and structural replacement parts therefor; trailer hitch mounted wheeled carrying platforms; trailer parts and accessories, namely, landscape tool boxes that are specially adapted for and mounted on the trailer for storage for utility trailers; trailer light protectors specially adapted for mounting on trailers; spare tire carriers for trailer mounting; utility trailer racks for mounting on trailers, to hold, for example, landscape tools; trailer transporter dollies; hitch mounted truck bed extenders; gooseneck hitch mounting plates; wheel bearing protector covers; wheel bearing kits and bearing protectors for trailers; metal hook and chain combinations being structural parts for trailers; wheel hub kits comprising wheel hub and bearings and lug studs or bolts and lug nuts and dust cover; spindle kits for trailers comprising a spindle, lockwasher, castle nut and cotter pin; bolt on chain pockets to tie down cargo specially designed for trailer manufacture or repair; trailer hitch coupler repair kits comprising a handle, spring, lock, nylon bolt, and under jaw; trailer hitch tipper latches to be welded or bolted on to trailer to allow ramp gate to latch or the trailer to tilt; tandem mechanical equalizers, being suspension parts, for trailer axles; drums and hubs for the wheel brake assembly; spare tire carriers; trailer suspension leaf springs; axles for trailers; fenders and tandem fenders for trailers; and, brake replacement kits for trailers comprising a brake replacement assembly and screws | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 3, 2026 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Mar 3, 2026 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 3, 2026 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Mar 3, 2026 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Mar 3, 2026 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Mar 23, 2025 | EWAF | TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS | — |
| Mar 23, 2025 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Mar 23, 2025 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 23, 2025 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Oct 4, 2022 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Oct 4, 2022 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 1, 2022 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Aug 31, 2022 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Aug 31, 2022 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Aug 31, 2022 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Aug 16, 2022 | IUAF | USE AMENDMENT FILED | — |
| Aug 16, 2022 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Apr 23, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Apr 21, 2022 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Apr 21, 2022 | EXT1 | SOU EXTENSION 1 FILED | — |
| Apr 21, 2022 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Nov 16, 2021 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Sep 21, 2021 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 21, 2021 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 1, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 17, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 16, 2021 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Aug 16, 2021 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Aug 16, 2021 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Aug 16, 2021 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Aug 10, 2021 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 26, 2021 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 28, 2021 | NWAP | NEW APPLICATION ENTERED | — |