Drawing for BE BIOGAS ENGINEERING

USPTO serial 90533525

BE BIOGAS ENGINEERING

Reviewed by CopyMark Law Group

Reg. 6976678Status 700Registered
Filing date
Status date
Registration date
Feb 14, 2023
Examiner
AYALA, LOURDES
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with BE BIOGAS ENGINEERING?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Kumar Maheshwari

Kumar Maheshwari MAHESH LAW GROUP, PC7700 IRVINE CENTER DR. #800IRVINE, CA 92618UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
037Construction of facilities in the biogas to renewable energy field, namely, construction of facilities for storage, production, distribution and transportation of biogas for energy production purposes and construction of facilities for producing electric energy and heat from biogas; Construction site preparation, namely, installation of utilities and processing equipment in construction sites for energy production facilities and for facilities for use in connection with for storage, production, distribution and transportation of biogas for energy production purposes; Construction project management services, namely, construction management and maintenance of facilities for storage, production, distribution and transportation of biogas for energy production purposes in the field of biogas collection and biogas utilization projects; Maintenance and repair of infrastructure and facilities in the biogas-to-energy field; construction site preparation, namely, planning and laying out of utilities for energy production facilities; construction consulting in the biogas to renewable energy field, namely, consulting in the field of construction of biogas to renewable energy field facilities which store, produce, distribute and transport biogas for energy production purposes; consulting in the field of construction of biogas to renewable energy facilities for producing electric energy and heat from biogasACTIVEMar 7, 2016
042Engineering design, namely, civil and mechanical engineering design in the biogas to renewable energy field, namely, civil and mechanical engineering design in the fields of constructing energy production facilities and biogas storage, production, distribution and transportation facilities; Engineering design, namely, civil and mechanical engineering design in the fields of cleanup and treatment system design, facility design, collection and control system design, methane mitigation system design, foundation and building design, landfill cell and sequencing design, and hydrological modeling in the biogas to renewable energy fieldACTIVEMar 7, 2016

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 14, 2023NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Feb 14, 2023R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 29, 2022NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 29, 2022PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 9, 2022NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 27, 2022CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 26, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 25, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 25, 2022TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 26, 2022GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 26, 2022GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 26, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 25, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 25, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 24, 2022ALIEASSIGNED TO LIE—
Mar 22, 2022ALIEASSIGNED TO LIE—
Mar 19, 2022TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 19, 2021GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 19, 2021GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 19, 2021CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 14, 2021DOCKASSIGNED TO EXAMINER—
Aug 16, 2021CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Aug 16, 2021TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Aug 16, 2021COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
May 20, 2021MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
May 19, 2021NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 19, 2021CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Mar 19, 2021TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Mar 19, 2021COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Feb 22, 2021NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance