USPTO serial 90538259
Reviewed by CopyMark Law Group
These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 001 | Concrete additives; Concrete admixtures; Agglutinants for concrete; Chemical additives for use as binding agents in concrete; Chemical additives for concrete building components; Chemical compounds for curing concrete | ACTIVE | — |
| 007 | Concrete construction machines | ACTIVE | — |
| 017 | Rapid cure, high strength, polymer-based concrete patching compound; Wall system consisting of insulated concrete block | ACTIVE | — |
| 019 | Concrete beams; Concrete blocks; Concrete building materials, namely, polymer modified panels, blocks, beams, trusses, and other configurations used in concrete buildings and kits; Concrete drainage structures, namely, trench drains; Concrete fencing in the nature of a noise barrier; Concrete floors; Concrete footings; Concrete mix; Concrete panels; Concrete patching compound made of a tar base; Concrete pipes; Concrete poles for use as building materials; Concrete retaining walls; Concrete road pavement boards; Concrete stair treads; Concrete walls; Concrete walls for building; Asphalt-based coatings for use on concrete building components; Blocks of concrete; Building materials, namely, concrete-based slabs made using recycled glass; Building materials, namely, pre-cast concrete wall forms; Construction materials in the nature of non-metal composite panels composed primarily of polymer modified concrete; Construction materials, namely, energy conserving precast concrete slabs; Construction materials, namely, concrete slabs designed to increase energy efficiency and energy conservation; Construction materials, namely, energy conserving concrete slabs; Containment systems for large scale liquid spills or releases, namely, berms made of polymer concrete, vinyl, or fiberglass; Crash barriers of polymer modified concrete for roads; Drain pipes made of polymer modified concrete; Floor patching materials, namely, concrete sealers; Industrial concrete for use in civil engineering works; Non-metal slabs of polymer modified concrete; Non-metallic reinforcements for concrete and wood building construction, namely, plates, rods and bars; Offshore drilling platforms made primarily of concrete; Polymer concrete; Ready to use concrete; Self-leveling concrete for use in building construction; Slabs of concrete designed to conserve energy; Stepping and footing stones of concrete or wood for use in lawns and pathways; Stucco in the nature of decorative concrete overlays; Tar-based concrete and asphalt patching compound; Tombstones of stone, concrete or marble; Transportable precast concrete buildings; Wall system consisting of reinforced, dry-stacked, engineered concrete block with insulating core and coated with surface bond cement | ACTIVE | — |
| 037 | Concrete pumping; Cement parging of interior and exterior stone block and concrete foundations; Construction of civil engineering structures by forming concrete; Construction of civil engineering structures by laying concrete; Construction of civil engineering structures by pouring concrete; Construction of civil engineering structures using concrete; Construction services, namely, concrete paving, site clearing, excavation, pad preparation, grading, and asphalt paving services | ACTIVE | — |
| 040 | Processing of concrete | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 7, 2022 | MAB2 | ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Apr 7, 2022 | MAB2 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Apr 7, 2022 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Apr 4, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 16, 2021 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 16, 2021 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 16, 2021 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 16, 2021 | DOCK | ASSIGNED TO EXAMINER | — |
| May 22, 2021 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 25, 2021 | NWAP | NEW APPLICATION ENTERED | — |