USPTO serial 90541931
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Gregory Bennett
Gregory Bennett XEROX CORPORATION201 MERRITT 7NORWALK, CT 06851UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Structural, hydrological, geotechnical, meteorological, chemical and climatological sensors, including but not limited to fiber optic sensors, for measuring physical characteristics in a system in the nature of vibration, strain, stress, load deflection, fluid or air pressure, displacement, fluid level, angular rotation, fluid flow, precipitation, wind speed, rainfall or snow-water equivalent, temperature, and pressure; Apparatus for monitoring strain, stress, load, fluid or air pressure, displacement, fluid level, angular rotation, fluid flow, precipitation, wind speed, rainfall or snow-water equivalent, temperature, pressure, and chemical change; Monitoring systems comprised of monitors for visualization, namely, computer monitors, optical interrogators and sensors sold as a unit, for measuring and monitoring physical characteristics in the nature of strain, stress, load deflection, fluid or air pressure, displacement, fluid level, angular rotation, fluid flow, precipitation, wind speed, rainfall or snow-water equivalent, temperature, pressure, and chemical change; Downloadable software, namely, software for use in real time analytics for asset base monitoring, management, forecasting and prediction of maintenance needs; downloadable software, namely, software for use in real time analytics that enables monitoring of transportation and structural assets in critical infrastructure for structural health, condition and usage | ACTIVE | — |
| 037 | Installation, maintenance and repair of systems comprised of computers and sensors for buildings, bridges, tunnels, ports, roads, runways, other civil structures and modes of transportation | ACTIVE | — |
| 042 | Providing the temporary use of online nondownloadable software, namely, cloud-based software for use in real time analytics for asset base monitoring, management, forecasting and prediction of maintenance needs; Providing the temporary use of online nondownloadable software, namely, cloud-based software for use in real time analytics that enables monitoring of transportation and structural assets in critical infrastructure for structural health, condition and usage; Providing services of monitoring conditions of buildings, bridges, tunnels, ports, roads, and runways, namely, atmospheric pressure and structural integrity, using computers and sensors | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 13, 2023 | MAB6 | ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Mar 13, 2023 | ABN6 | ABANDONMENT - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Jun 29, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jun 27, 2022 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Jun 27, 2022 | EXT1 | SOU EXTENSION 1 FILED | — |
| Jun 27, 2022 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jun 23, 2022 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jun 23, 2022 | EWAF | TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS | — |
| Jun 23, 2022 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 23, 2022 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Feb 8, 2022 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Dec 14, 2021 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 14, 2021 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 24, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Nov 9, 2021 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Nov 9, 2021 | EWAF | TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS | — |
| Nov 9, 2021 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 9, 2021 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Nov 8, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 8, 2021 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Nov 8, 2021 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Nov 8, 2021 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Nov 8, 2021 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Sep 16, 2021 | DOCK | ASSIGNED TO EXAMINER | — |
| May 24, 2021 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 26, 2021 | NWAP | NEW APPLICATION ENTERED | — |