USPTO serial 90590089
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Timothy M. Kenny
Timothy M. Kenny NORTON ROSE FULBRIGHT US LLP98 SAN JACINTO BOULEVARD, SUITE 1100AUSTIN, TX 78701United States| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Solid waste landfill services, soil and solid debris landfill services | ACTIVE | — |
| 039 | Packaging, collection, and transportation of hazardous, non-hazardous, residual, universal, pharmaceutical, regulated medical and chemotherapeutic waste and waste water; disposal in the nature of removal of hazardous, non-hazardous, residual, universal, pharmaceutical, regulated medical and chemotherapeutic waste and waste water and transporting that material to another location for treatment and recycling; transportation of soil and dredged material; storage of hazardous, non-hazardous, residual, universal, pharmaceutical, regulated medical and chemotherapeutic waste; repacking of plastics, cardboards, glass and aluminum material for the creation of alternative fuels and other products, namely, ethanol, bio-diesel, oils, soaps and lotions; consulting services related to the transport and disposal of contaminated soils | ACTIVE | — |
| 040 | Stationary and mobile management of waste in the nature of destruction, processing, and treatment of hazardous, non-hazardous, residual, universal, pharmaceutical, regulated medical and chemotherapeutic waste and the treatment and recycling of wastes, contaminated soil, and dredged material for beneficial use by others; waste treatment by bulking, chemical fixation, blending of liquids, sludges and solids, stabilization of heavy metal liquids, solidification, naturalization of acids and alkaline, waste to energy processing; mercury thermal retort, recycling, processing, treatment, and destruction of liquids, solids, sludges, electronics, aerosol cans, solvents, asbestos, off-specification materials, waste water, liquid industrial waste water, and universal waste; environmental remediation services, namely, soil treatment to include treatment and recycling of contaminated and uncontaminated soils, gravel, potable water treatment sludges and solids, drill or pipeline cuttings, brick, block, concrete, rock, pond sediment, earthen media; remediation of hydrocarbon soils, including sand and gravel; environmental remediation services, namely, soil treatment and reuse of remediated soil, dredged material and drill cuttings; environmental remediation services, namely, soil treatment and soil treatment for eventual re-use of the soil; treatment of materials, namely, bioremediation treatment, thermal desorption treatment, chemical fixation treatment, and physical treatment in the nature of sorting and mixing waste and recyclable material; recycling, including a mail back recycling program; destruction, reclamation, recycling, and shredding of plastics, cardboards, glass and aluminum material for the creation of alternative fuels and other products, namely, ethanol, bio-diesel, oils, soaps and lotions; manufacturing services for others in the field of aggregate materials, namely, clay, stone, and other minerals; environmental remediation services, namely, treatment of solid waste and water; secure data destruction of electronics; on-site data destruction services and high security data destruction services, namely, destruction of data storage devices; degaussing | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 29, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Apr 29, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 7, 2025 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Apr 7, 2025 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Apr 3, 2025 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Apr 3, 2025 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Jan 24, 2025 | IUAF | USE AMENDMENT FILED | — |
| Jan 24, 2025 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Jul 25, 2024 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jul 25, 2024 | EX5G | SOU EXTENSION 5 GRANTED | — |
| Jul 25, 2024 | EXT5 | SOU EXTENSION 5 FILED | — |
| Jul 25, 2024 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jan 19, 2024 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jan 17, 2024 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Jan 17, 2024 | EXT4 | SOU EXTENSION 4 FILED | — |
| Jan 17, 2024 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jul 27, 2023 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jul 25, 2023 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Jul 25, 2023 | EXT3 | SOU EXTENSION 3 FILED | — |
| Jul 25, 2023 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jan 26, 2023 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jan 24, 2023 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Jan 24, 2023 | EXT2 | SOU EXTENSION 2 FILED | — |
| Jan 24, 2023 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jul 27, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jul 25, 2022 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Jul 25, 2022 | EXT1 | SOU EXTENSION 1 FILED | — |
| Jul 25, 2022 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jan 25, 2022 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Nov 30, 2021 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Nov 30, 2021 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 10, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Oct 25, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 22, 2021 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 23, 2021 | MDSC | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Jun 22, 2021 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 23, 2021 | NWAP | NEW APPLICATION ENTERED | — |