USPTO serial 90637946
HOORAYSUN
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Mar 22, 2022
- Examiner
- FARRELL, ANNE M
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with HOORAYSUN?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Jurong Jiahe Photovoltaic Technology Co., Ltd.
Jiangsu,, CN
Other trademarks owned by Jurong Jiahe Photovoltaic Technology Co., Ltd.
Jurong Jiahe Photovoltaic Technology Co., Ltd.
Jiangsu,, CN
Other trademarks owned by Jurong Jiahe Photovoltaic Technology Co., Ltd.
Jurong Jiahe Photovoltaic Technology Co., Ltd.
Jiangsu,, CN
Other trademarks owned by Jurong Jiahe Photovoltaic Technology Co., Ltd.
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jonathan G. Morton
1395 BRICKELL AVE.,SUITE 900MIAMI, FL 33131Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Apparatus for converting electronic radiation to electrical energy, namely, photovoltaic solar modules; Automatic solar tracking sensors; Crystalline silicon solar cells; Electrical cables; Electrical interconnect cables; Extension cables; Off-grid power and deep cycle battery storage systems comprised of batteries, charge controllers and inverters with integrated LED bulbs and LED light fixtures for solar installations; Off-grid power and deep cycle battery storage systems comprised of batteries, charge controllers and inverters with integrated LED bulbs and LED light fixtures for thin-film solar (TFS) installations; Photovoltaic cells also including a solar thermal collector sold as a unit; Photovoltaic solar modules for production of electricity; Photovoltaic solar panels for the production of electricity; Programmable controllers and actuators that track the sun enabling concentrating optics to maximize solar energy input; Solar-powered battery chargers; Solar-powered rechargeable batteries; Solar panels for production of electricity; Solar panels for the production of electricity | ACTIVE | Jan 1, 2021 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Jurong Jiahe Photovoltaic Technology Co., Ltd.
- Other trademarks owned by Jurong Jiahe Photovoltaic Technology Co., Ltd.
- Other trademarks owned by Jurong Jiahe Photovoltaic Technology Co., Ltd.
- Other trademarks in Class 009
- Similar marks named HOORAYSUN
- Prosecution event R.PR explained
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 22, 2022 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 4, 2022 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 4, 2022 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 15, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 2, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 2, 2021 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 19, 2021 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 15, 2021 | NWAP | NEW APPLICATION ENTERED | — |