USPTO serial 90645128
AMBER ROCK
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Oct 31, 2023
- Examiner
- BRACEY, KAREN
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with AMBER ROCK?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Pudong, Shanghai, CN
Pudong, Shanghai, CN
SHANGHAI EXPLORETRIC TECHNOLOGY CO., LTD.
SHANGHAI, CN
Other trademarks owned by SHANGHAI EXPLORETRIC TECHNOLOGY CO., LTD.
Pudong, Shanghai, CN
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Utsav Mukherjee
Utsav Mukherjee One Juris PC5233 Fresno AvenueRichmond, CA 94804United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Electric apparatus for commutation, namely, commutators; electric installations for the remote control of industrial operations; power station automatization equipment, namely, energy storage battery; recorded computer software for use in battery management systems to monitor and control voltage, temperature, coolant flow and current in rechargeable batteries; electric control panels; batteries, electric; accumulators, electric; cathodes; plates for batteries; battery chargers | ACTIVE | Mar 25, 2021 |
| 012 | Electric vehicles; cars; remote control land vehicles for transportation; caravans in the nature of travel trailers; battery-powered land motor vehicles; motorcycles; driverless cars, namely, self-driving cars; mopeds; bicycles; vehicles for locomotion by land, air, water or rail | ACTIVE | Mar 25, 2021 |
| 037 | Providing information in the field of equipment repair; electric cables construction, namely, laying of cables; electric appliance installation and repair; machinery installation, maintenance and repair; rebuilding machines that have been worn or partially destroyed; motor vehicle maintenance and repair; retreading of tires; burglar alarm installation and repair; vehicle battery charging service; charging service for electric land vehicle | ACTIVE | Mar 25, 2021 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Pylon Technologies Co., Ltd.
- Other trademarks owned by Pylon Technologies Co., Ltd.
- Other trademarks owned by SHANGHAI EXPLORETRIC TECHNOLOGY CO., LTD.
- Other trademarks owned by Pylon Technologies Co., Ltd.
- Other trademarks in Class 009
- Other trademarks in Class 012
- Other trademarks in Class 037
- Similar marks named AMBER ROCK
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Dec 4, 2024 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Nov 25, 2024 | EWAF | TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS | — |
| Nov 25, 2024 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Nov 25, 2024 | EWOR | TEAS WITHDRAWAL AS DOMESTIC REPRESENTATIVE RECEIVED | — |
| Nov 25, 2024 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 25, 2024 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Oct 31, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Oct 31, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 23, 2023 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Sep 22, 2023 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Sep 18, 2023 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Sep 17, 2023 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Sep 8, 2023 | IUAF | USE AMENDMENT FILED | — |
| Sep 8, 2023 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Mar 14, 2023 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jan 17, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 17, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 28, 2022 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 12, 2022 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 8, 2022 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 8, 2022 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 8, 2022 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Jun 17, 2022 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Jun 17, 2022 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jun 17, 2022 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jun 1, 2022 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 1, 2022 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 1, 2022 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 6, 2021 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 6, 2021 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 6, 2021 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 6, 2021 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 23, 2021 | MDSC | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Jul 22, 2021 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 17, 2021 | NWAP | NEW APPLICATION ENTERED | — |