Drawing for NETMATION

USPTO serial 90791137

NETMATION

Reviewed by CopyMark Law Group

Reg. 7663048Status 700Registered
Filing date
Status date
Registration date
Jan 21, 2025
Examiner
NEHMER, JASON ROBERT
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with NETMATION?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Charles T. J. Weigell

Charles T. J. Weigell FROSS ZELNICK LEHRMAN & ZISSU, P.C.151 W. 42ND STREET, 17TH FLOORNEW YORK, NY 10036United States

Goods and services

ClassDescriptionStatusFirst use
009Downloadable application software used for diagnostics and troubleshooting of power plant equipment; downloadable application software used for data logging and printing; downloadable application software used for operation and remote monitoring of industrial plants; downloadable application software used for programming logics and functions of industrial plants operation; downloadable application software used for detecting and monitoring combustion pressure fluctuation; downloadable application software used for remote monitoring and analysis of power plant equipment; downloadable application software used to remotely view, monitor, program, operate and control large and small appliances, electrical systems and security systems of industrial plants; downloadable simulation software for learning control of power plant equipment; boiler control instruments; turbine control instruments; diagnostic apparatus for ensuring proper functioning of industrial plants; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity; electric control panels; fire detectors; infrared detectors; phase indicators; vibration analyzers; pressure measuring apparatus; vibration meters; analogue to digital converters; computer central processing units; computer circuit boards; computer network adapters; connectors for electronic circuits; interface cards for data processing apparatus in the form of printed circuits; microcomputers; microcontrollers; integrated circuit modules equipped with infrared detectors for detecting flame in furnaces; integrated circuit modules for remote monitoring and controlling gas turbines; Integrated circuit modules used for transferring and receiving digital and analog signals; control system computer hardware and recorded control system computer software used for local or remote control, operation, monitoring, diagnosis, adjustment, optimizing, data recording, maintenance and testing of industrial manufacturing plants and public utility plantsACTIVEApr 30, 2001
037Upgrading of computer hardware; repair and maintenance of electronic data processing apparatus; providing information relating to the repair or maintenance of industrial furnaces; providing information relating to the repair or maintenance of boiler systems; providing maintenance and repair information of industrial furnaces via a website; providing maintenance and repair information of boiler systems via a website; maintenance services in the nature of adjustment and repair of control and monitoring systems for industrial manufacturing plants and public utility plants; repair and maintenance of boiler control instruments, turbine control instruments, diagnostic apparatus for ensuring proper functioning of industrial plants, apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity, electric control panels, fire detectors, infrared detectors, microphones, phase indicators, vibration analyzers, pressure measuring apparatus and vibration metersACTIVEApr 30, 2003
042Monitoring of computer systems for detecting unauthorized access or data breach; data migration services; recovery of computer data; data encryption services; database development services; monitoring the control systems of others for industrial plants and public utility plants, namely, monitoring the control systems of others for industrial plants and public utility plants consisting of boiler control instruments, turbine control instruments, diagnostic apparatus for ensuring proper functioning of industrial plants, apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity, electric control panels, fire detectors, infrared detectors, microphones, phase indicators, vibration analyzers, pressure measuring apparatus and vibration metersACTIVEApr 30, 2001

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 21, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED
Jan 21, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 31, 2024SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
Oct 31, 2024CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
Oct 31, 2024SUPCSTATEMENT OF USE PROCESSING COMPLETE
Oct 31, 2024AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL
May 22, 2024EPPATEAS POST PUBLICATION AMENDMENT RECEIVED
May 21, 2024IUAFUSE AMENDMENT FILED
May 21, 2024EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Nov 23, 2023EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
Nov 21, 2023EX1GSOU EXTENSION 1 GRANTED
Nov 21, 2023EXT1SOU EXTENSION 1 FILED
Nov 21, 2023EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
May 23, 2023NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Mar 28, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Mar 28, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 8, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Feb 22, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Feb 18, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Feb 17, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Feb 17, 2023ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED
Aug 24, 2022GNFNNOTIFICATION OF FINAL REFUSAL EMAILED
Aug 24, 2022GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 24, 2022CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 10, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Aug 10, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Aug 10, 2022TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 18, 2022ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP
Mar 15, 2022GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 15, 2022GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 15, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 14, 2022DOCKASSIGNED TO EXAMINER
Sep 9, 2021NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Jun 26, 2021NWAPNEW APPLICATION ENTERED

Frequently asked questions

Related guidance