Drawing for INNOLEA

USPTO serial 90799103

INNOLEA

Reviewed by CopyMark Law Group

Status 606
Filing date
Status date
Registration date
—
Examiner
SNAPP, TINA LOUISE
Law office
INTENT TO USE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with INNOLEA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Ben Natter

Ben Natter HAUG PARTNERS, LLP745 Fifth AvenueNEW YORK, NY 10151United States

Goods and services

ClassDescriptionStatusFirst use
007Current generatorsACTIVE—
009Connections for electric lines; Antennas; Electric transformers, electricity conduits, electric contacts, circuit breakers, electric intensity meters, electric converters, and reversing electrical switches; Electrical control devices for wind energy plants; Electrical control devices for wind farms; Electrical power distribution equipment, namely, units, machines, blocks and panels; Inverter; Control cabinets specially adapted for renewable energy power plants; Switch gear, namely, electrical disconnect switches, fuses and circuit breakers; Fire-extinguishing devices; Electrolytic devices for generating hydrogen and oxygen, namely, metallic and electronic conductors used for generation of hydrogen and oxygen; Accumulator batteries; Energy regulation and energy conversion apparatus and instruments, namely, downloadable software and computer hardware customized for monitoring and regulating energy consumption and facilitating conversion of energy; electric battery and accumulator systems for storage and supply of electricity for vehicles comprised primarily of batteries, downloadable computer operating software, computer hardware, battery chargers and recorded software for monitoring and regulating energy consumption and facilitating conversion of energy; electric battery and accumulator systems for use in the storage, supply, transmission and stabilization of electricity supplied by or to an electric power grid or other source of electric power generation comprised primarily of batteries, downloadable computer operating software, computer hardware, battery chargers, and recorded software for monitoring and regulating energy consumption and facilitating conversion of energy; Downloadable computer software for monitoring, optimizing and regulating the storage, transmission and discharge of energy to and from such electric battery or accumulator systems; electronic control systems, in particular flexible AC transmission systems comprised primarily of batteries, downloadable computer operating software, computer hardware, battery chargers, and recorded software for monitoring and regulating energy consumption and facilitating conversion of energy; electronic control systems which are used in electricity supply networks for targeted influence of power flows comprised primarily of electronic circuits, computer hardware, downloadable computer operating software, and batteries; Static power electronics which influence targeted electrical parameters for power transfer in one or more AC networks in order to optimize transmission capacity; intelligent charge management systems for battery charging stations featuring technology to maximize electrical consumption utilized, battery life, duration of charging, timing of charging, and environmental impact comprised primarily of batteries, downloadable computer operating software, and computer hardware; Charging stations for electric vehicles; Inverter units; Rectifiers; Electricity transformers; Electric Boost converters; Electronic payment terminalsACTIVE—
011Power plants; Renewable energy power plantsACTIVE—
037Construction of buildings, wind power plants and water treatment installations, in particular foundation contractor services, road construction, and construction of renewable energy power plants and water treatment plants; Maintenance, rust removal, and repair of wind power plants and water treatment installations; Installation of wind power plants and water treatment installations; Providing maintenance and repair services for electric vehicles; Installation, integration, maintenance, repair and upgrading of electric battery and accumulator systems, and consultancy in relation thereto, for the storage, discharge, supply, transmission and stabilization of electricity; Leasing of electric battery and accumulator systems for the storage, discharge, supply, transmission and stabilization of electricity; Operation, maintenance and regulation of electric battery and accumulator systems for the storage, discharge, supply, transmission and stabilization of electricity, and consultancy relating thereto; Recharging of batteries and accumulatorsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB6): The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.

DateCodeEventWhat it means
Oct 7, 2024MAB6ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Oct 7, 2024ABN6ABANDONMENT - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Mar 6, 2024EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Mar 5, 2024EX1GSOU EXTENSION 1 GRANTED—
Mar 5, 2024EXT1SOU EXTENSION 1 FILED—
Mar 5, 2024EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Sep 5, 2023NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jul 11, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 11, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 21, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jun 5, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 5, 2023XAECEXAMINER'S AMENDMENT ENTERED—
Jun 5, 2023GRMLCORRESPONDENCE E-MAILED—
Jun 5, 2023CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 5, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 5, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 5, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 21, 2023GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 21, 2023GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 21, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 27, 2023ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Jan 24, 2023PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Jan 11, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 6, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 6, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 6, 2023ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Oct 17, 2022GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Oct 17, 2022GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Oct 17, 2022CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Sep 15, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 15, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 15, 2022TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 18, 2022GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 18, 2022GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 18, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 18, 2022DOCKASSIGNED TO EXAMINER—
Jan 20, 2022TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jan 20, 2022ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 20, 2022REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Sep 10, 2021NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 1, 2021NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance