Drawing for AIEDS

USPTO serial 90834113

AIEDS

Reviewed by CopyMark Law Group

Reg. 7592921Status 700Registered
Filing date
Status date
Registration date
Dec 10, 2024
Examiner
JOINER, KATINA JACKSON
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with AIEDS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
009Data processing apparatus; computer programs, recorded, for data processing, storage and transmission for electric drive system; computer operating programs, recorded; computer software, recorded, for electric drive systems, namely, key components failure prognostic and life-time prediction model in the cloud, remote calibration of vehicle torque control system, electric drive system parameter online automatic optimization, electric drive digital twin model establishment and iteration; smart cards, namely, integrated circuit cards; integrated circuit cards; computer programs, downloadable, for electric drive system, namely, over-the-air remote control parameter update, and smart sensor in electric drive system; computer software applications, downloadable, for electric drive system, namely, key components failure prognostic and life-time prediction model in the cloud, remote calibration of vehicle torque control system, electric drive system parameter online automatic optimization, sensor fusion algorithm; computer software platforms, recorded or downloadable, for electric drive system, namely over-the-air remote control parameter update, electric drive embedded software system, service-oriented architecture, cloud-edge collaborative platform; computer hardware; simulators for the steering and control of vehicles; electricity transformers; printed circuit boards; circuit breakers; electricity control panels; electricity inverters; remote control apparatus for electric drive system, namely, key components failure prognostic and life-time prediction model in the cloud, remote calibration of vehicle torque control system, electric drive system parameter online automatic optimization, cloud digital-twin model iteration excluding gaming apparatus; chips, namely, integrated circuit chips; wafers for integrated circuits; step-up transformersACTIVE—
012Transmission gears for land vehicles; motors, electric, for land vehicles; electric vehicles; clutches for land vehicles; engines for land vehicles; motors for land vehicles; driving motors for land vehicles; transmission chains for land vehicles; propulsion mechanisms for land vehicles; gear boxes for land vehicles; driving chains for land vehicles; transmission belts for land vehicles; torque converters for land vehicles; reduction gears for land vehicles; transmission shafts for land vehiclesACTIVE—
042Computer system analysis; conversion of computer programs and data, other than physical conversion; monitoring of computer systems by remote access to ensure proper functioning; software as a service (SaaS) services featuring software for electric drive system, namely, intelligent after-sales service of electric drive system, remote calibration service of electric drive system, self-learning feature service for vehicle drive control parameters, smart service driven by cloud digital-twin model; electronic data storage; providing virtual computer systems and virtual computer environments through cloud computing; platform as a service (PaaS) featuring computer software platforms for electric drive system, namely, operation of cloud digital-twin model platform, cloud-edge data and model management platform, big data system of electric drive system; vehicle roadworthiness testingACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 24, 2025WOAGWITHDRAWAL OF ATTORNEY GRANTED—
Sep 24, 2025WOARTEAS WITHDRAWAL OF ATTORNEY RECEIVED—
Dec 10, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Dec 10, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 10, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 10, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 21, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 6, 2024ADBS1(B) BASIS DELETED; NEW BASIS REQUESTED—
Aug 6, 2024IUCNNOTICE OF ALLOWANCE CANCELLED—
May 28, 2024JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY—
May 28, 2024PCBGPETITION TO DIRECTOR - CHANGE BASIS - GRANTED—
May 28, 2024APETASSIGNED TO PETITION STAFF—
May 28, 2024APETASSIGNED TO PETITION STAFF—
May 1, 2024EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Apr 30, 2024EX3GSOU EXTENSION 3 GRANTED—
Apr 30, 2024EXT3SOU EXTENSION 3 FILED—
Apr 30, 2024EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Apr 18, 2024TPADTEAS PETITION TO AMEND BASIS RECEIVED—
Nov 1, 2023EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Oct 30, 2023EX2GSOU EXTENSION 2 GRANTED—
Oct 30, 2023EXT2SOU EXTENSION 2 FILED—
Oct 30, 2023EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Apr 17, 2023TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Apr 17, 2023ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Apr 17, 2023EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS—
Apr 17, 2023ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 17, 2023REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Apr 15, 2023EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Apr 13, 2023EX1GSOU EXTENSION 1 GRANTED—
Apr 13, 2023EXT1SOU EXTENSION 1 FILED—
Apr 13, 2023EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Nov 1, 2022NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Sep 6, 2022NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 6, 2022PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 17, 2022NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 28, 2022CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 21, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 21, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 21, 2022TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 21, 2022GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 21, 2022GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 21, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 20, 2022DOCKASSIGNED TO EXAMINER—
Sep 20, 2021NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 20, 2021NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance