Drawing for MTN

USPTO serial 90866572

MTN

Reviewed by CopyMark Law Group

Reg. 6862792Status 700Registered
Filing date
Status date
Registration date
Oct 4, 2022
Examiner
LOBO, DEBORAH E
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with MTN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Camille M. Miller

Camille M. Miller COZEN O'CONNOR1650 MARKET STREETSUITE 2800PHILADELPHIA, PA 19103

Goods and services

ClassDescriptionStatusFirst use
035Preconstruction services, namely, scheduling construction of all disciplines for others; value engineering, namely, cost analysis, cost value analysis, life cycle cost analysis, cost control management; bid quotation package development, namely, bidding quotation; subcontractor prequalification in the nature of verifying and monitoring the credentials of construction subcontractors for business purposes; procurement of construction subcontracts for others; online retail store featuring industrial, safety and entertainment products and apparel in the nature of pants, jackets, shorts, shirts, hoodies, sweaters, T-shirts and footwear, eye and ear protection, hard hats, head lamps, harnesses, anchors, ropes, helmets, gloves, protective face masks, rigging, hoists, carabineers, hardware, tools, flashlights, axes, knives, trolley, clamps, measuring devices and other safety equipment, sound blankets, film production equipment, live event production equipment, mining equipment, portable lighting, lodestar parts, stool storage, trusses and truss pieces, tower lifts and related accessories; providing and rental of exhibition stands and booths including respective equipmentACTIVEDec 8, 2014
037Installation of temporary structures for trade fairs, trade shows, and professional and entertainment exhibitions; Installing temporary structures for disaster relief; Installing signs and drywall panels; Building construction; Temporary structure construction services; Display installation services, namely, installation of point of purchase displays; Installation of signboards and signs; Building construction, namely, construction of temporary structures in the nature of stands, stages and booths; Construction management; General construction contracting; Building construction supervision; Construction site work services in the nature of site preparation, grading, construction of underground utilities, site clearing and grubbing, demolition, building pad preparation, concrete paving, asphalt paving, site hardscaping, and construction of retaining walls; construction project management services; Repair and erection of scaffolding; concrete construction, namely, construction of structures by laying concrete; General construction contracting; Construction supervision of civil engineering works; Rental of construction equipment; Rental of cranes for construction purposes; Rental of equipment for construction, demolition, cleaning and maintenance; Quarrying services; Mining extraction; Advisory services relating to excavating; Excavation services; Building construction and repair; Construction of decking, railings, foundations, temporary barriers, drainage structures, guardrails, traffic lane striping, and installation of lighting; traffic signalization, and signage; Construction management supervision; Construction and renovation of buildings; Construction consultancy; Construction supervision; Construction planning; Preconstruction management services, namely, construction consultation; all of the foregoing excluding installation, repair and maintenance of communications and telecommunications equipment or installations.ACTIVE—
042Consulting in the fields of engineering and architecture, namely, engineering design and drawing of building components for others in the fields of industrialized construction and modular and refabricated building construction; Architectural design of building components for others in the fields of industrialized construction and modular and prefabricated building construction; software as a service (SAAS) services featuring software for providing a map interface or geographic information for emergency shelter services to connect users providing temporary housing with users looking for temporary housing; software as a service (SAAS) services featuring software for providing access to an emergency response system with geographic information for temporary housing and available resources; charitable services, namely, providing mapping services for shelters and temporary housing to assist victims of emergencies or disastersACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 4, 2022NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Oct 4, 2022R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 19, 2022NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 19, 2022PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 29, 2022NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jun 14, 2022CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 14, 2022XAECEXAMINER'S AMENDMENT ENTERED—
Jun 14, 2022GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jun 14, 2022GNEAEXAMINERS AMENDMENT E-MAILED—
Jun 14, 2022CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 13, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 13, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 13, 2022TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 12, 2022GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 12, 2022GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 12, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 10, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 10, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 10, 2022TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 6, 2022GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 6, 2022GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 6, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 4, 2022DOCKASSIGNED TO EXAMINER—
Sep 29, 2021NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 9, 2021NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance