USPTO serial 90874992
GRIDPOINT INTELLIGENT ENERGY NETWORK
Reviewed by CopyMark Law Group
Status 606
- Filing date
- Status date
- Registration date
- —
- Examiner
- KOLODNER, LOUIS FRANCIS
- Law office
- INTENT TO USE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with GRIDPOINT INTELLIGENT ENERGY NETWORK?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
B. Brett Heavner
B. Brett Heavner FINNEGAN, HENDERSON, FARABOW, GARRETT & DUNNER LLP901 NEW YORK AVENUE NWWASHINGTON, DC 20001United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | On-site energy generation, namely, electricity generators | ACTIVE | — |
| 009 | Downloadable and recorded Computer software platform for use in the measurement, control, storage and deployment of electrical energy; Downloadable and recorded Computer software platform for directing the measurement, control, storage and deployment of electrical energy; On-site energy storage, namely, electrical storage batteries; Temperature and humidity monitoring equipment, namely, digital smart thermostats; Intelligent controls for HVAC and building loads, namely, commercial property electrical power automation systems comprised of computer hardware, wireless and wired controllers, and downloadable software platform for automating HVAC and other electrical loads | ACTIVE | — |
| 037 | Installation and maintenance of power equipment, namely, distributed generators, surge protectors and energy conditioners for use in distributed generation products for others | ACTIVE | — |
| 039 | Energy demand management through connectivity with utilities, namely, demand response, energy storage, and demand-side electricity use | ACTIVE | — |
| 042 | Design of building electric energy control systems for others and engineering services in the field of computerized temperature, fire, safety, security and light control, and energy usage management monitoring; Energy monitoring services for others, namely, viewing or recording the timing or level of use and control of electricity used by selected devices; Technical consultation in the field of electrical power monitoring, control, generation and storage systems; Providing temporary access to online non-downloadable computer software for use in the measurement, control, storage, and deployment of electrical energy; Providing temporary access online to non-downloadable computer software for directing the measurement, control, storage, and deployment of electrical energy | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by GridPoint, Inc.
- Other trademarks owned by GridPoint, Inc.
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 037
- Other trademarks in Class 039
- Other trademarks in Class 042
- Similar marks named GRIDPOINT INTELLIGENT ENERGY NETWORK
- Prosecution event MAB6 explained
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 29, 2025 | MAB6 | ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Sep 29, 2025 | ABN6 | ABANDONMENT - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Feb 26, 2025 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 26, 2025 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Feb 25, 2025 | EXT4 | SOU EXTENSION 4 FILED | — |
| Feb 25, 2025 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Aug 28, 2024 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Aug 28, 2024 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Aug 28, 2024 | EXT3 | SOU EXTENSION 3 FILED | — |
| Aug 28, 2024 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Feb 28, 2024 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 27, 2024 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Feb 27, 2024 | EXT2 | SOU EXTENSION 2 FILED | — |
| Feb 27, 2024 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Aug 30, 2023 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Aug 28, 2023 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Aug 28, 2023 | EXT1 | SOU EXTENSION 1 FILED | — |
| Aug 28, 2023 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Feb 28, 2023 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jan 3, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 3, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 14, 2022 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Nov 28, 2022 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 28, 2022 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Nov 28, 2022 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Nov 28, 2022 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Nov 28, 2022 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Nov 24, 2022 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 23, 2022 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 23, 2022 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 24, 2022 | GPRN | NOTIFICATION OF PRIORITY ACTION E-MAILED | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| May 24, 2022 | GPRA | PRIORITY ACTION E-MAILED | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| May 24, 2022 | CPRA | PRIORITY ACTION WRITTEN | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| May 10, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 1, 2021 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 13, 2021 | NWAP | NEW APPLICATION ENTERED | — |