USPTO serial 90979677
FARO SPHERE
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Jun 6, 2023
- Examiner
- DUBOIS, SUSAN L
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with FARO SPHERE?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Michelle P. Ciotola
Michelle P. Ciotola CANTOR COLBURN LLP20 CHURCH STREETFLOOR 22HARTFORD, CT 06103Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 042 | Providing temporary use of online non-downloadable software that connects to cloud-based service for comparison and analysis of scans and measures on reality and design data retrieved from a device compared to measurements in a database, for shared web services, use workflows, and featuring central online access point for architecture engineering and construction applications including as-build documentation and modelling, quality control, scan processing and registration, 3d metrology for inspection, assembly, meshing, statistical process control, and public safety analytics featuring 2d diagramming, 3d diagramming, animation, and blood spatter analysis; providing temporary use of online non-downloadable software for cloud-based applications for providing access to remote diagnostics on software and hardware, predictive maintenance, and training, storage, integration and data connection to third party apps, mobile device support and browser based access and real-time access to highly accurate 3d reality data in real time; providing temporary use of online non-downloadable cloud-based hosting platform featuring cloud-based applications for shared web services for comparison and analysis of scans and measures on reality and design data retrieved from a device compared to measurements in a database, for shared web services, use workflows, and featuring central online access point for architecture engineering and construction applications including as-build documentation and modelling, quality control, scan processing and registration, 3d metrology for inspection, assembly, meshing, statistical process control, and public safety analytics featuring 2d diagramming, 3d diagramming, animation, and blood spatter analysis; providing temporary use of online non-downloadable software for providing access to remote diagnostics on software and hardware, predictive maintenance, and training, storage, integration and data connection to third party apps, mobile device support and browser based access and real-time access to highly accurate 3d reality data in real time; software as a service (SAAS) services featuring software for cloud-based applications for shared web services for comparison and analysis of scans and measures on reality and design data retrieved from a device compared to measurements in a database, for shared web services, use workflows, and featuring central online access point for architecture engineering and construction applications including as-build documentation and modelling, quality control, scan processing and registration, 3d metrology for inspection, assembly, meshing, statistical process control, and public safety analytics featuring 2d diagramming, 3d diagramming, and animation, blood spatter analysis; software as a service (SAAS) services featuring software for providing access to remote diagnostics on software and hardware, predictive maintenance, and training, storage, integration and data connection to third party apps, mobile device support and browser based access and real-time access to highly accurate 3d reality data in real time | ACTIVE | Apr 12, 2022 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 6, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jun 6, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 3, 2023 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| May 2, 2023 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Apr 26, 2023 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Apr 26, 2023 | DPCC | DIVISIONAL PROCESSING COMPLETE | — |
| Apr 26, 2023 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Apr 6, 2023 | IUAF | USE AMENDMENT FILED | — |
| Apr 6, 2023 | DRRR | DIVISIONAL REQUEST RECEIVED | — |
| Apr 6, 2023 | ERTD | TEAS REQUEST TO DIVIDE RECEIVED | — |
| Apr 6, 2023 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Dec 30, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Dec 28, 2022 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Dec 28, 2022 | EXT2 | SOU EXTENSION 2 FILED | — |
| Dec 28, 2022 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jun 30, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jun 28, 2022 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Jun 28, 2022 | EXT1 | SOU EXTENSION 1 FILED | — |
| Jun 28, 2022 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Dec 28, 2021 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Nov 29, 2021 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Nov 29, 2021 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Nov 29, 2021 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Nov 2, 2021 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Nov 2, 2021 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 13, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 29, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 17, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 16, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 16, 2021 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 17, 2021 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 17, 2021 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 17, 2021 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 16, 2021 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 3, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 19, 2020 | NWAP | NEW APPLICATION ENTERED | — |