USPTO serial 90980290
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
CARROLLTON, TX
Woodside, CA
Woodside, CA
Woodside, CA
WOODSIDE, CA
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Katherine M. Basile
Katherine M. Basile REED SMITH LLPP.O. BOX 488PITTSBURGH, PA 15230UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Construction consultation; building construction; providing information in the field of building construction; construction planning; General building contractor services; general building sub-contractor services, namely, foundation contractor, framing contractor, electrical contractor, mechanical contractor, plumbing contractor, landscaping contractor, carpentry contractor, HVAC contractor, heating contractor, plastering contractor, paving contractor, drywall contractor, painting contractor; Construction services, namely, construction of multifamily structures, mass timber high rise buildings, masterplan building developments, industrial complexes, educational campuses, and retail buildouts; Custom construction of single-family homes, multifamily structures, commercial buildings, residential and commercial communities; Construction project management services; construction grading services; construction of modular buildings and homes; advisory services relating to building construction of commercial buildings, residential buildings, prefabricated, prefinished volumetric construction (PPVC) homes, and modular homes; construction services, namely, planning, laying out and construction of residential and commercial communities; Construction services, namely, planning, laying out and custom construction of residential and commercial communities; Construction services, namely, concrete paving, site clearing, excavation, pad preparation, grading, and asphalt paving services; Housing services, namely, development of real property, namely, repair, improvement, and new construction; renovation of commercial and residential buildings | ACTIVE | Aug 31, 2020 |
| 040 | Custom manufacture of transportable buildings; technical support services, namely, providing technical advice related to the manufacture of building materials; custom manufacture of appliances, flooring, roofing, countertops, walls, cladding and fireplaces, doors, door panels, windows, cabinets and drywall | ACTIVE | Aug 31, 2020 |
| 042 | Architectural design services; residential building design services; Providing quality assurance services in the field of construction and construction related supply chain services; Engineering design services; Engineering drawing services; Structural engineering design services; Architectural and engineering services; Conducting engineering surveys; Computer-aided engineering services for others; Product development services for others; Environmental engineering, testing and inspection services; Engineering services, namely, engineering for the building and construction industries; Engineering services in the field of environmental compliance; Engineering services in the field of energy efficiency; landscape architectural design; landscape lighting design; Consulting services in the field of industrial engineering; Environmental services, namely, technical consultation in the field of environmental science, engineering services and design for others in the field of environmental engineering; interior design services; Research and development in the field of seismic, acoustic and fire testing products; testing of buildings of others to assure compliance with seismic, acoustic, and fire standards in the construction industry; interior design consultation; providing graphic design services to create specialty interior environment settings; design of specialty interior and exterior environment settings; technical consulting in the field of interior design; interior design services including space planning, furniture selection, material and surface selection | ACTIVE | Aug 31, 2020 |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| May 1, 2024 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Jan 10, 2024 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Oct 10, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Oct 10, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 8, 2023 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Sep 7, 2023 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Sep 1, 2023 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Sep 1, 2023 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Sep 1, 2023 | DPCC | DIVISIONAL PROCESSING COMPLETE | — |
| Sep 1, 2023 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| May 30, 2023 | EXT4 | SOU EXTENSION 4 FILED | — |
| May 30, 2023 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Mar 27, 2023 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Mar 6, 2023 | IUAF | USE AMENDMENT FILED | — |
| Mar 6, 2023 | DRRR | DIVISIONAL REQUEST RECEIVED | — |
| Mar 6, 2023 | ERTD | TEAS REQUEST TO DIVIDE RECEIVED | — |
| Mar 6, 2023 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Dec 6, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Dec 2, 2022 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Dec 2, 2022 | EXT3 | SOU EXTENSION 3 FILED | — |
| Dec 2, 2022 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| May 17, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| May 13, 2022 | EX2G | SOU EXTENSION 2 GRANTED | — |
| May 13, 2022 | EXT2 | SOU EXTENSION 2 FILED | — |
| May 13, 2022 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Dec 9, 2021 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Dec 7, 2021 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Dec 7, 2021 | EXT1 | SOU EXTENSION 1 FILED | — |
| Dec 7, 2021 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jun 8, 2021 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Apr 13, 2021 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Apr 13, 2021 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 24, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Mar 5, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 4, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 3, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 3, 2021 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 15, 2020 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 15, 2020 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 15, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 11, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 18, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 20, 2020 | NWAP | NEW APPLICATION ENTERED | — |