USPTO serial 97010269
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Anthony V. Lupo
Anthony V. Lupo ARENTFOX SCHIFF LLP1717 K STREET, N.W.WASHINGTON, DC 20006-5344UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Roofing of metal, incorporating photovoltaic cells; Metal stands and other metal rods for the installation and assembly of photovoltaic modules and systems | ACTIVE | — |
| 007 | Machines used in the solar industry in the nature of automated machines for coating solar wafers with thin films by chemical vapor deposition, plasma enhanced chemical vapor deposition, and physical vapor deposition, automated machines for heat and light treatments, automated machines for manufacturing solar cell interconnection members, automated machines for positioning and interconnecting solar cells and components in solar modules, and automated machines for measuring electrical parameters during illumination and labeling solar modules according to measurement results; Generators of electricity; Solar-powered generators of electricity; Sorting machines for industry, namely, automated machines for sorting solar wafers according to mechanical, electrical, and optical and automated machines for sorting produced solar cells according to characterization measurement results; Machines for processing and manufacturing ingots, semiconductor substrates, solar wafers, solar cells, solar cell strings and solar modules; Machines for laser treatment of solar wafers and solar cells; Machines for edge insulation of solar cells in particular by laser ablation and etching; Machines for the treatment of material, in particular surface treatment, vapour deposition, cutting and etching systems; Machines for the manufacture of solar cells, namely, metallization machinery; Solar cell and solar module manufacturing machines forming modular production line equipment for the processing and the manufacturing of solar cells and solar modules; Spare and wear parts for machines used in the solar industry; Machine tools used in the solar industry, namely, automated foil and wire cutters, frame presses | ACTIVE | — |
| 009 | Inspection machines for the physical inspection of solar intermediate products for use in quality control in the solar industry; Apparatus and instruments for conducting, switching, transforming, accumulating, regulating and controlling electricity; Solar photovoltaic modules; Solar cells; Photovoltaic cells and modules; Solar wafers; solar panels for production of electricity; Electric current testing apparatus for use in the photovoltaic industry, namely, pulse generators; Apparatus for measuring and testing the performance and efficiency of photovoltaic power plant equipment elements; Calibrated photovoltaic reference cells; Inverters for electricity; Accumulators in the nature of batteries; Solar batteries; Battery chargers; Protective cover glass for solar modules; Solar simulators for solar cells and solar modules; Spare parts for solar simulators; Cyclotrons; microwave systems, namely, power supplies, magnetrons, isolators, waveguides and measuring devices; wiring and electrical plug-in connectors for solar panels and hybrid solar panels; furnaces for laboratory use; mounting systems for solar modules and for crystals used in the solar industry | ACTIVE | — |
| 011 | Photovoltaic installations for generating electricity, namely, photovoltaic-based power plants | ACTIVE | — |
| 019 | Roofing, not of metal, incorporating photovoltaic cells | ACTIVE | — |
| 037 | Construction, installation, maintenance and repair services in the field of solar energy; Construction, installation, maintenance and repair of photovoltaic plants, apparatus, modules and cells and solar heating systems; Construction, installation, maintenance and repair of photovoltaic industry manufacturing plants | ACTIVE | — |
| 040 | Generation of electricity; Generation of electricity from solar energy; Consultancy services relating to the generation of electrical power; Consultancy services relating to the generation of electricity by solar energy | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 3, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Oct 3, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 18, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jul 18, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 28, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jun 12, 2023 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jun 5, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 5, 2023 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jun 5, 2023 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jun 5, 2023 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jun 5, 2023 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jan 10, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 10, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 10, 2023 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Jan 9, 2023 | ALIE | ASSIGNED TO LIE | — |
| Nov 10, 2022 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 12, 2022 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 12, 2022 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 12, 2022 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 9, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 4, 2022 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Mar 4, 2022 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Mar 4, 2022 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 4, 2022 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Oct 16, 2021 | MDSC | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Oct 15, 2021 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Sep 7, 2021 | NWAP | NEW APPLICATION ENTERED | — |