Drawing for TECHNOTRANS

USPTO serial 97035723

TECHNOTRANS

Reviewed by CopyMark Law Group

Reg. 7376867Status 700Registered
Filing date
Status date
Registration date
May 7, 2024
Examiner
KOVALSKY, LAURA G
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with TECHNOTRANS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Nicholas J. Gingo

Nicholas J. Gingo RENNER, OTTO, BOISSELLE & SKLAR, LLP1621 EUCLID AVE.19TH FLOORCLEVELAND, OH 44115

Goods and services

ClassDescriptionStatusFirst use
007Machines, mechanical apparatus and devices for the printing industry, in particular peripheral devices and apparatus for offset printing machines, namely, mechanical dampening water treatment devices, cooling devices, temperature control devices for inking units, humidifying devices, dampening solution recycling devices, lacquer circulating devices, silicone application devices, dosing devices, ink supply devices, all being machine parts; Machines, mechanical apparatus and devices and systems assembled therefrom for or in connection with the production of CD / LD data carriers, in particular electroplating systems in the nature of electroplating bath systems, pure water systems, waste water systems, wet chemical preparation systems, comprised of electroplating machines and electrolysis apparatus for electroplating; Punching machines; Machines and machine tools for material processing and production, namely, laser machines and laser devices for welding and cutting; Machine parts and machine tools, namely, apparatus, devices and instruments for cooling and temperature control as components of machines for processing materials, as components of machines for production, and as components of printing machines and laser instruments; Machines parts, namely, mechanical apparatus, devices and instruments for conveying and applying oils and aqueous solutions to surfaces, to machines and machine parts, in particular spray oiling of surfaces, machines and machine parts of lasers and laser instruments; Machines parts, namely, mechanical apparatus, devices and instruments for directing and applying oils and aqueous solutions to foodstuffs and surfaces for the production of foodstuffs, in particular spray oiling of ready meals, foodstuffs and surfaces of molds, trays and conveyor systems; Machines parts, namely, mechanical apparatus, devices and instruments for cooling and temperature control of power generation and power distribution devices, in particular power generators; Control mechanisms for machines, pumps, machine tools, compressors and motors for machines, namely, pump control valves; Compressors for machines; and parts and fittings for the aforesaid goods all being machine partsACTIVE—
009Control valves for regulating the flow of gases and liquids; Electronic apparatus, devices and instruments for controlling the temperature of batteries, accumulators, power generation and power distribution devices for electric charging stations for vehicles, in the nature of modular cooling and temperature control systems comprising thermostats, single-zone temperature control units, thermoelectric controlling units; Electronic controllers and locks for lasers, laser apparatus, laser devices and laser instruments; Cooling units adapted for computers; Air and liquid cooling control apparatus for the thermal management of computer servers, namely, for air and liquid supported cooling, temperature control, heat recovery and heat removalACTIVE—
010Medical devices and instruments for measuring, dosing, controlling, regulating and controlling the temperature and cooling of positron emission tomography and magnetic resonance tomography apparatus; Medical devices and instruments for measuring, dosing, controlling, regulating and controlling the temperature and cooling of medical, dental and veterinary apparatus, devices and instruments as well as for measuring, dosing, controlling, regulating and controlling the temperature of people; Medical apparatus, devices and instruments for cooling and temperature control as components of medical, dental and veterinary lasers, laser apparatus, laser devices and laser instruments for medical, dental and veterinary purposesACTIVE—
011Cooling installations for cooling the water in batteries; Cooling apparatus and devices for cooling vehicle batteries, namely, vehicle battery cooling systems comprised of interchangeable and reconfigurable cooling units which utilize compressed refrigerant, water circuits, or cooling plates for heat removal; Air filtering installations; Air filters for cleaning, humidifying, dehumidifying, heating and cooling units; Air and liquid cooling apparatus for the thermal management of data centers, namely, for air and liquid supported cooling, temperature control, heat recovery and heat removal; Air handlers for cooling data centers; Air conditioning condensers for use in cooling data centers and computer rooms; Dehumidifiers for use in cooling data centers and computer rooms; Air filters for air conditioning and air cooling apparatus; Air cooling units adapted for computer server racks; Liquid cooling units adapted for computer server racks; Liquid cooling units adapted for computer server racks; Electronic apparatus, devices and instruments for cooling of batteries, accumulators, power generation and power distribution devices for electric charging stations for vehicles, in the nature of modular cooling and temperature control systems comprising water cooling units, air cooling units, and charging cable cooling unitsACTIVE—
042Engineering services for the development, assembly, installation, servicing, maintenance, repair and cleaning of machines, mechanical apparatus and devices, in particular for machines, mechanical apparatus and devices for the printing industry, cooling technology, water and wastewater treatment technology, filtration technology, punching, pressing and forming technology, information technology as well as for machines, mechanical apparatus and devices in the field of medical, dental and veterinary medicine technology for measuring, dosing, controlling, regulating and controlling the temperature and cooling, in particular temperature and the cooling of apparatus, devices, instruments and people; Technical writing for the aforesaid services; Technological consulting services via the internet in the fields of machines, mechanical apparatus and devices, in particular for the printing industry, cooling technology including coolant and cooling lubricant treatment, water and wastewater treatment technology, filtration technology, punching, pressing and forming technology, information technology as well as machines, mechanical apparatus and devices in the field of medical, dental and veterinary medicine technology for measuring, dosing, monitoring, regulating and controlling the temperature and/or the cooling, in particular the temperature and the cooling of apparatus, devices, instruments and peopleACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 7, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
May 7, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 4, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 20, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 1, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 1, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jan 31, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jan 17, 2024FIXDELECTRONIC RECORD REVIEW COMPLETE—
Jan 12, 2024ERRRON HOLD - ELECTRONIC RECORD REVIEW REQUIRED—
Dec 8, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 8, 2023XAECEXAMINER'S AMENDMENT ENTERED—
Dec 8, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Dec 8, 2023GNEAEXAMINERS AMENDMENT E-MAILED—
Dec 8, 2023CNEAEXAMINERS AMENDMENT -WRITTEN—
Nov 3, 2023XAECEXAMINER'S AMENDMENT ENTERED—
Nov 3, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Nov 3, 2023GNEAEXAMINERS AMENDMENT E-MAILED—
Nov 3, 2023CNEAEXAMINERS AMENDMENT -WRITTEN—
Oct 11, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 11, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 11, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 12, 2023GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 12, 2023GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 12, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 5, 2023ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Jun 20, 2023PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Jun 8, 2023PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
May 26, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 26, 2023XAECEXAMINER'S AMENDMENT ENTERED—
May 26, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
May 26, 2023GNEAEXAMINERS AMENDMENT E-MAILED—
May 26, 2023CNEAEXAMINERS AMENDMENT -WRITTEN—
May 26, 2023XAECEXAMINER'S AMENDMENT ENTERED—
May 26, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
May 26, 2023GNEAEXAMINERS AMENDMENT E-MAILED—
May 26, 2023CNEAEXAMINERS AMENDMENT -WRITTEN—
Apr 25, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 24, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 24, 2023ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jan 25, 2023GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Jan 25, 2023GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jan 25, 2023CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Dec 28, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 28, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 28, 2022TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 29, 2022GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 29, 2022GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 29, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 22, 2022DOCKASSIGNED TO EXAMINER—
Oct 28, 2021AMPXPRELIMINARY/VOLUNTARY AMENDMENT - ENTERED—
Oct 28, 2021ALIEASSIGNED TO LIE—
Oct 26, 2021MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Oct 23, 2021NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 23, 2021PARITEAS VOLUNTARY AMENDMENT RECEIVED—
Sep 23, 2021PARITEAS VOLUNTARY AMENDMENT RECEIVED—
Sep 23, 2021PARITEAS VOLUNTARY AMENDMENT RECEIVED—
Sep 23, 2021NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance