USPTO serial 97051320
ARQESS EVOLUTIVE HABITATS
Reviewed by CopyMark Law Group
Status 606
- Filing date
- Status date
- Registration date
- —
- Examiner
- JOHNSON, AISHA CLARKE
- Law office
- INTENT TO USE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with ARQESS EVOLUTIVE HABITATS?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Stephen Kilroy
26 MOHAWK STREET,RYE, NY 10580United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Environmental monitoring system comprised of meters and sensors that measure pressure, humidity, temperature and includes alarm and reporting functions; Computer hardware and recorded software system for remotely monitoring environmental conditions and controlling devices within a building, facility, grounds, or designated spatial area; Electronic monitors to collect operational data and settings, including temperature data and settings, from HVAC equipment to ensure proper functioning; Electronic-based instruments for measuring environmental parameters including humidity, mold, bacteria, air quality and water quality; Scientific instruments, namely, electronic analyzers for measuring, testing and detecting contaminants and environmental pollutants | ACTIVE | — |
| 035 | Charitable services, namely, organizing and developing projects to promote awareness of tree and environmental conservation; Promoting public awareness of environmental issues and initiatives; Promoting public awareness of environmental matters; Promoting the interests of people concerned with health, community and environmental sustainability issues | ACTIVE | — |
| 037 | Construction and maintenance of buildings; Construction consultation; Construction information services; Construction of commercial buildings; Construction of houses; Construction of industrial buildings; Construction of modular buildings; Construction of modular homes; Construction of office buildings; Construction of residential buildings; Construction services, namely, planning, laying out and custom construction of commercial buildings; Construction, maintenance and renovation of buildings; Construction, maintenance and repair of transportable and prefabricated buildings; Construction, repair and maintenance of buildings; Advisory services relating to building construction; Advisory services relating to the construction of buildings; Building construction advisory services; Building construction consultancy services; Consultancy and information services relating to construction; Consultancy relating to residential and building construction; Consultancy relating to the construction of buildings; Consultancy services relating to building construction; Consultancy services relating to the construction of buildings; Consultation services in the field of construction of environmentally-conscious buildings; Consulting in the field of building construction; Custom construction of buildings; Custom construction of homes; Custom construction of houses; Housing services, namely, repair, improvement, and construction of residential real property; Providing information relating to building construction; Providing news and information in the field of environmentally-conscious building construction; Provision of construction advice; Provision of construction information; Provision of information relating to building construction; Provision of technical information in the field of building construction; Repair and installation services, namely, the installation of heating, cooling and environmental control systems primarily using solar energy, renewable energy resources and rainwater; Residential and building construction consulting; Residential and commercial building construction; Technical consultation in the field of building construction | ACTIVE | — |
| 042 | Architectural and engineering services; Architectural consultancy services; Architectural consultation; Architectural research; Architectural services; Environmental engineering, testing and inspection services; Environmental services, namely, design for others in the field of environmental engineering; Environmental services, namely, technical consultation in the field of environmental science; Environmental services, namely, technical consultation in the field of environmental science, engineering services and design for others in the field of environmental engineering; Consulting in the fields of engineering and architecture; Consulting services in the field of architectural design; Electronic monitoring and reporting of dwelling systems using computers or sensors; Electronic monitoring of dwelling systems using computers and sensors; Professional consulting services in the fields of engineering, land use planning, surveying, landscape architecture, and environmental sciences; Providing a website featuring environmental information about climate change and bio-diversity; Providing technological and scientific information about environmentally-conscious and green innovations; Providing technological information about environmentally-conscious and green innovations; Research in the field of environmental protection; Research in the field of building construction; Research on building construction or city planning; Software as a service (SAAS) services featuring software for the purpose of the optimization and the efficient operation of energy generation, monitoring and management systems, water monitoring and management systems, waste monitoring, management and recycling systems, environmental monitoring, management and purification systems, weather monitoring systems and security systems in dwellings; Software as a service (SAAS) services featuring software using artificial intelligence for the purpose of the optimization and the efficient operation of energy generation, monitoring and management systems, water monitoring and management systems, waste monitoring, management and recycling systems, environmental monitoring, management and purification systems, weather monitoring systems and security systems in dwellings. Technical consultancy in the field of environmental science; Technical consultation in the field of environmental science, engineering services, design for others in the field of energy engineering, designing and testing of energy products for others; Technical consulting in the field of environmental engineering | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Arqess Atelier, LLC
- Other trademarks owned by Arqess Atelier, LLC
- Other trademarks owned by ARQESS, INC.
- Other trademarks in Class 009
- Other trademarks in Class 035
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named ARQESS EVOLUTIVE HABITATS
- Prosecution event MAB6 explained
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 5, 2024 | MAB6 | ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Aug 5, 2024 | ABN6 | ABANDONMENT - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Mar 13, 2024 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Mar 12, 2024 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Mar 6, 2024 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Feb 26, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 23, 2024 | INCE | ITU OFFICE ACTION ISSUED FOR EXTENSION REQUEST | — |
| Jan 18, 2024 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Dec 29, 2023 | EXT2 | SOU EXTENSION 2 FILED | — |
| Dec 29, 2023 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jun 30, 2023 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jun 28, 2023 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Jun 28, 2023 | EXT1 | SOU EXTENSION 1 FILED | — |
| Jun 28, 2023 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jan 3, 2023 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Nov 8, 2022 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Nov 8, 2022 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 19, 2022 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Oct 3, 2022 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 3, 2022 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Oct 3, 2022 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Oct 3, 2022 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Oct 3, 2022 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Aug 29, 2022 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Aug 29, 2022 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Aug 29, 2022 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 19, 2022 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 18, 2022 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 18, 2022 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 8, 2022 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 8, 2022 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 8, 2022 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 29, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 28, 2021 | MDSC | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Oct 27, 2021 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 2, 2021 | NWAP | NEW APPLICATION ENTERED | — |