USPTO serial 97062349
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jay G. Durst
Jay G. Durst BOYLE FREDRICKSON S.C.840 N. PLANKINTON AVE.MILWAUKEE, WI 53203UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Manufacturing machines and apparatus, namely, semiconductor fabrication machines and magnetic storage fabrication machines; manufacturing machines and apparatus, namely, molecular beam epitaxy (MBE) systems including components therefore and metal organic chemical vapor deposition (MOCVD) systems including wafer carriers and components therefore, wafer processing machines; photolithographic machines and parts therefore for manufacturing semiconductor wafers and semiconductor substrates; semiconductor wafer processing machines for atomic layer deposition systems; semiconductor wafer processing equipment; semiconductor single wafer processing machines using etch chemicals for the semiconductor industry; semiconductor single wafer wet processing machines using solvent chemicals; machines for semiconductor manufacturing containing ion sources and ion source controllers for vacuum coating processes; molecular beam epitaxy crucibles and effusion cells sold as an integral component of machines for manufacturing semi-conductors and integrated circuits; heated high speed rotating disks operated under high vacuum and exposed to the flow of chemicals in the production of semiconductors sold as an integral component of machines for manufacturing semi-conductors; optical coating ion beam machine for coating multi-layer optical thin films sold as an integral component of machines for manufacturing semi-conductors | ACTIVE | Jan 19, 1990 |
| 009 | laser annealing systems comprised of lasers for industrial use for annealing purposes; gas sensors and control valves for regulating gas concentrations and mass transfer rates in various manufacturing processes; downloadable computer control software for use in ion beam system applications through touch screen mode for user control in Ion Beam Deposition (IBD), Ion Beam Etch (IBE) and Sputtering systems | ACTIVE | Jan 19, 1990 |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 22, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Aug 22, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 6, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 6, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 17, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 3, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 3, 2023 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| May 3, 2023 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| May 3, 2023 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| May 3, 2023 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Mar 21, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 20, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 20, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 20, 2022 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 20, 2022 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 20, 2022 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 11, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 23, 2022 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| Jan 26, 2022 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| Oct 30, 2021 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 9, 2021 | NWAP | NEW APPLICATION ENTERED | — |