Drawing for RENEW

USPTO serial 97076167

RENEW

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
REGAN, JOHN B
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 686 means your mark is published in the USPTO Official Gazette and in the 30-day opposition period. If no opposition is filed, prosecution typically continues toward registration or a Notice of Allowance. Monitor the opposition window. After it closes, watch for Notice of Allowance (intent-to-use) or registration (use-based).

Status 686: Status 686 means your mark is published in the USPTO Official Gazette and in the 30-day opposition period. If no opposition is filed, prosecution typically continues toward registration or a Notice of Allowance.

Need help with RENEW?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

DENNIS S. PRAHL

DENNIS S. PRAHL LADAS & PARRY LLP1040 AVENUE OF THE AMERICASNEW YORK, NY 10018United States

Goods and services

ClassDescriptionStatusFirst use
004Electrical energy from renewable sources; Electrical energy from solar power, Electrical energy from wind power; Renewable fuels; Methanol fuelACTIVE—
007Wind-powered installations, namely, wind turbine generators including components such as nacelle, hub, gearbox, blades for generating electricity; hydroelectric-powered installations, namely, run of the river hydroelectric turbine generators, for generating electricity; wind turbines and their components sold as a unit therewith, namely, nacelle, gearbox, generator, control system, hub, tower and blades; parts of wind turbine motors, namely, compact drive systemsACTIVE—
009electric control devices for energy management; solar panels for electricity generation; electrical-power distribution system, namely, power distribution panels, transmission lines, power transformers, cables; electric power supply units; inverters composed of wires, cables and other materials; electrical batteries, chargers for batteries, electric converters and inverters, photo-voltaic cells, solar panels for production of electricity, and batteries for electricity; electric and electronic equipment in the nature of computer hardware and computer equipment in the nature of hardware, all for wind turbines, wind power plants and other wind-powered machines; checking and monitoring equipment in the nature of electronic sensors and SCADA (Supervisory Control And Data Acquisition) computer control-system architecture for the automatic power up and power down of generators, and for automatic starting after a general power failure; surge protection apparatus to protect against lightning strikes; microprocessors for the checking and monitoring of voltage regulation, of frequency, of phase state, and of rotor speed, and for checking the efficiency and thickness of brake pads, temperature, wind direction and wind speed; vibration sensors for mounting on windmill housings; watt-hour meters; microprocessors for controlling and monitoring constant voltage, frequency, phase conditions, rotor speed, efficiency and thickness of brake pads, temperature, wind direction and wind speedACTIVE—
011Wind power plants; renewable energy sources, namely, hydro energy sources, namely, run of the river hydroelectric power plants; solar energy receivers; energy storage plants; alternative energy generation power plants; solar energy based cooling apparatus; solar energy collectors for heating; solar-energy-powered heating installations; heat pumps for energy processing; thermal storage apparatus for heating, namely, heating apparatus in the nature of solar collectors for use with wind turbines; solar energy collectors for heatingACTIVE—
035Advertising and business services, namely, business management, business administration, and providing general office functions in relation to energy production and energy recycling; business venture development and formation consulting services for the renewable energy industry; business consulting and advisory services in the field of energy efficiency; energy management services, namely, providing a service that allows customers to purchase energy, namely, electricity, natural gas and renewable energy; energy usage management information services; retail energy provider services that allow customers to purchase renewable electrical energy; consultation in the field of energy efficiencyACTIVE—
036financing of development of renewable energy generation facilities, the foregoing limited to solar power generation, wind power generation, hydroelectric power generation, green hydrogen power generation, non-renewable power generation, afforestation, and carbon credit brokerageACTIVE—
037Installation, repair, and maintenance of energy conversion apparatus and power plants, and consultancy and information in connection with the foregoing; installation of energy saving apparatus, namely LED's and Power Quality improvement equipments, and consultancy and information in connection with the foregoing; repair of energy supply installations, and consultancy and information in connection with the foregoing; installation of renewable energy generation equipment, and consultancy and information in connection with the foregoing; installation, maintenance, and repair of windmills and wind turbines, and consultancy and information in connection with the foregoing; erection, installation, maintenance, and repair of wind turbines, wind stations, and other wind-powered machines, and consultancy and information in connection with the foregoing; construction of wind turbines, wind stations, and other wind-powered machines, and consultancy and information in connection with the foregoing; consultancy and information in connection with the construction of wind turbines, wind stations, and other wind-powered machinesACTIVE—
039Electricity distribution services; storage, distribution, and supply of energy and fuels; distribution of renewable energy; distribution and transmission of electricityACTIVE—
040Services of energy generation; energy production; energy recycling services; rental of energy generating equipment; transformation of energy, namely, generation of energy by converting wind, solar, hydro into electrical power; custom fabrication of wind turbines, wind stations, and other wind-powered machines; consultancy and information in connection with the custom fabrication of wind turbines, wind stations, and other wind powered machinesACTIVE—
042Energy auditing; design and development of energy-management software and of energy distribution computer networks; scientific research in the field of energy; technical engineering assistance, consultancy, and information relating to wind-turbine and wind-power projects, and implementation of the aforesaid projects; construction drafting and testing of wind turbines, wind power plants, wind-powered machines, and components therefor; conducting scientific research projects in relation to wind turbines, wind power plants, and other wind-powered machines, and providing technical engineering assistance, consultancy, and information with regard to the development and testing of wind turbines, wind power plants, wind-powered machines, and components therefor; technical engineering consultancy and information relating to the setting up, construction, installation, maintenance, and repair of wind turbines, wind stations, and other wind-powered machinesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 27, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 27, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 21, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 25, 2026ERRRON HOLD - ELECTRONIC RECORD REVIEW REQUIRED—
Sep 17, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 31, 2026OTHECASE RETURNED TO EXAMINATION—
Aug 31, 2026IUCNNOTICE OF ALLOWANCE CANCELLED—
Jul 13, 2026ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Jul 13, 2026GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jul 13, 2026XAECEXAMINER'S AMENDMENT ENTERED—
Jul 13, 2026GNEAEXAMINERS AMENDMENT E-MAILED—
Jul 13, 2026SNEASU-EXAMINER'S AMENDMENT WRITTEN—
Jul 11, 2026ATRVATTORNEY REVIEW COMPLETED—
Aug 23, 2024JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY—
Aug 23, 2024PCBGPETITION TO DIRECTOR - CHANGE BASIS - GRANTED—
Aug 23, 2024APETASSIGNED TO PETITION STAFF—
Jul 22, 2024TPADTEAS PETITION TO AMEND BASIS RECEIVED—
Jan 23, 2024NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Nov 28, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 28, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 8, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 23, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 16, 2023XAECEXAMINER'S AMENDMENT ENTERED—
Oct 16, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Oct 16, 2023GNEAEXAMINERS AMENDMENT E-MAILED—
Oct 16, 2023CNEAEXAMINERS AMENDMENT -WRITTEN—
Sep 28, 2023XAECEXAMINER'S AMENDMENT ENTERED—
Sep 28, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Sep 28, 2023GNEAEXAMINERS AMENDMENT E-MAILED—
Sep 28, 2023CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 29, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 28, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 28, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 25, 2023XELGAPPLICATION EXTENSION GRANTED/RECEIPT PROVIDED—
May 25, 2023XELRAPPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED—
Feb 28, 2023GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 28, 2023GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 28, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 28, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 26, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 26, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 26, 2022GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 26, 2022GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 26, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 21, 2022DOCKASSIGNED TO EXAMINER—
Nov 5, 2021MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Nov 4, 2021NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 19, 2021NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance