USPTO serial 97083762
NORTHAM
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Jan 24, 2023
- Examiner
- LEE, YATSYE ISADORA
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with NORTHAM?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Genevieve S. Larin
2915 OGLETOWN RDNEWARK, DE 19713UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Centrifugal pumps; Sewage pumps; Rotary pumps; Sump pumps; Vertical turbine pumps; Submersible pumps; Circulating pumps; Positive displacement pumps; Screw pumps; Rotary lobe pumps; Electric pumps; Axial flow pumps; Pneumatic pumps; Electrical water pumps for irrigation, agriculture, water treatment, residential, commercial and industrial application; Water pumps for irrigation, agriculture, water treatment, residential, commercial and industrial application; Reverse osmosis pumps; Pumps for cooling engines; Valves for pumps; Water pumps for use in motors and engines; Hydraulic pumps; Water treatment equipment, namely, pumps for use in irrigation systems; Pumps for machines; Pumps as parts of machines, motors and engines; Sludge pumps; Water pumps for hydroponics; Motors, gears and drives for orientating solar panels; Motors other than for land vehicles; Alternating current servo motors; Starters for motors and engines; Permanent magnet motors; Motors and pumps for refrigerators and freezers; Elevator motors; Electric motors for machines with a digital servo drive controller; Servo motors; Gear motors not for land vehicles; Inverter motors not for land vehicles; Asynchronous motors not for land vehicles; Servo-drives for motors; Drives for motors; Electric motors for machines; Motors, namely, synchronous motors not for land vehicles; Motors, namely, alternating current motors not for land vehicles; Motors for medical machines and apparatus; Electric motors, not for land vehicles; Electric motors, and their parts, not for land vehicles; Electric motors for power tools; Direct current motors; Linear motors; Motors for air conditioners; Electric starter motors; Electric motors for refrigerators; Hydraulic pumps and motors for hydrostatic systems, comprised of pumps, motors, valves, switches, sensors and electronic controls, for hydraulic drives and force transmission in machines, machine tools, grinding and food processing machines and in off-road-vehicles; Water aeration systems comprising water pumps, air compressors and air blowers; AC variable frequency drives that are used to control small and medium-sized motors in applications such as manufacturing processes, HVAC and pumps; Variable frequency drives for motors, other than for land vehicles; Soft starters for motors; Variable speed drives for use with fluid pumping systems; Wastewater pumping stations; Pump impellers | ACTIVE | Sep 27, 2022 |
| 009 | Electric control panels; Electrical controllers; Electronic servo motor controllers; Power controllers; Electronic speed controllers; Programmable controllers and actuators that track the sun enabling concentrating optics to maximize solar energy input; Electronic controllers for Fire pumps, HVAC pumps, sewage pumps, borehole submersible pumps, centrifugal pumps and solar pumps; Programmable electronic controllers for Fire pumps, HVAC pumps, sewage pumps, borehole submersible pumps, centrifugal pumps and solar pumps; Fire engines; Fire alarms; Fire pumps; Fire pump control valves; Solar cells; Apparatus for converting electronic radiation to electrical energy, namely, photovoltaic solar hybrid modules; Solar panels for the production of electricity; Photovoltaic inverters; Photovoltaic solar modules for production of electricity; Solar-powered battery chargers; Photovoltaic solar panels for the production of electricity; Power inverters; Inverters for power supply; Inverters; Chargers for electric batteries; Battery chargers; Battery chargers for use with vehicle batteries; Chargers for batteries; Frequency converters; Electrical apparatus, namely, charging stations for charging electric vehicles; Vehicle charging stations for electric vehicles; Centrifugal metering pumps; Touchscreens; Connection cables; Connecting electrical cables; Flow meters; Electrical integrated control systems for use in the field of HVAC, Fire, irrigation, water supply and waste water treatment; Electronic power supplies for driving electric motors; Electric motor control units for swimming pool, spa, water park and fountain pumps; Photovoltaic systems that convert sunlight into electric and thermal energy; Electric valve actuators; Automatic transfer switches (ATS); Fire and smoke detectors; Photovoltaic cells and modules; Charging stations for electric vehicles; Electric wires and cables; Smoke detectors; Photovoltaic modules; Polycrystalline silicon photovoltaic cells; Monocrystalline silicon photovoltaic cells; Amorphous silicon photovoltaic cells | ACTIVE | Sep 27, 2022 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 24, 2023 | NRCS | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jan 24, 2023 | R.SR | REGISTERED-SUPPLEMENTAL REGISTER | Your mark is registered on the Supplemental Register, which is available for marks that are not yet distinctive enough for the Principal Register but can still identify a source. Protection is more limited than Principal Register registration but can later support a Principal Register application. |
| Dec 21, 2022 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Dec 14, 2022 | ALIE | ASSIGNED TO LIE | — |
| Nov 26, 2022 | AAUA | NOTICE OF ACCEPTANCE OF AMENDMENT TO ALLEGE USE E-MAILED | — |
| Nov 25, 2022 | CNTA | APPROVED FOR REGISTRATION SUPPLEMENTAL REGISTER | — |
| Nov 25, 2022 | IUAA | USE AMENDMENT ACCEPTED | — |
| Oct 25, 2022 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 25, 2022 | AUPC | AMENDMENT TO USE PROCESSING COMPLETE | — |
| Oct 25, 2022 | IUAF | USE AMENDMENT FILED | — |
| Oct 24, 2022 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 24, 2022 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 24, 2022 | EAAU | TEAS AMENDMENT OF USE RECEIVED | — |
| Jul 27, 2022 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 27, 2022 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 27, 2022 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 27, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 6, 2021 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 23, 2021 | NWAP | NEW APPLICATION ENTERED | — |