Drawing for RENEW

USPTO serial 97093356

RENEW

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
REGAN, JOHN B
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 686 means your mark is published in the USPTO Official Gazette and in the 30-day opposition period. If no opposition is filed, prosecution typically continues toward registration or a Notice of Allowance. Monitor the opposition window. After it closes, watch for Notice of Allowance (intent-to-use) or registration (use-based).

Status 686: Status 686 means your mark is published in the USPTO Official Gazette and in the 30-day opposition period. If no opposition is filed, prosecution typically continues toward registration or a Notice of Allowance.

Need help with RENEW?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Dennis S. Prahl

Dennis S. Prahl LADAS & PARRY LLP1040 AVENUE OF THE AMERICASNEW YORK, NY 10018-3738United States

Goods and services

ClassDescriptionStatusFirst use
004Electrical energy from renewable sources; Electrical energy from solar power, Electrical energy from wind power; Renewable fuels; Methanol fuelACTIVE—
007Wind-powered installations, namely, wind turbine generators including components such as nacelle, hub, gearbox, blades for generating electricity; hydroelectric-powered installations, namely, run of the river hydroelectric turbine generators for generating electricity; wind turbines and their components sold as a unit therewith, namely, nacelle, gearbox, generator, control system, hub, tower and blades; parts of wind turbine motors, namely, compact drive systems; electrical generators using solar cells; wind-operated machines, namely, wind-powered electric generatorsACTIVE—
009electric control devices for energy management; solar panels for electricity generation; electrical-power distribution system, namely, power distribution panels, transmission lines, power transformers, cables; electric power supply units; inverters composed of wires, cables and other materials; electrical batteries, chargers for batteries, electric converters and inverters, photo-voltaic cells, solar panels for production of electricity, and batteries for electricity; electric and electronic equipment in the nature of computer hardware and computer equipment in the nature of hardware, all for wind turbines, wind power plants and other wind-powered machines; checking and monitoring equipment in the nature of electronic sensors and SCADA (Supervisory Control And Data Acquisition) computer control-system architecture for the automatic power up and power down of generators, and for automatic starting after a general power failure; surge protection apparatus to protect against lightning strikes; microprocessors for the checking and monitoring of voltage regulation, of frequency, of phase state, and of rotor speed, and for checking the efficiency and thickness of brake pads, temperature, wind direction and wind speed; vibration sensors for mounting on housings; watt-hour meters; microprocessors for controlling and monitoring constant voltage, frequency, phase conditions, rotor speed, efficiency and thickness of brake pads, temperature, wind direction and wind speed; test stations for hydrogen generators; solar cells; solar cell plates for the production of electricity; solar cell panels for the production of electricity; wafers for solar cells; crystalline silicon solar cells; photovoltaic installation apparatus, namely, solar modules for production of electricity; photovoltaic solar modules for production of electricity; apparatus for converting electronic radiation to electrical energy, namely, photovoltaic solar hybrid modules; wind turbine controller; electrolysers; power distribution panels constituting electrical distribution systems; power distribution systems, namely, electrical distribution panels; machines being electric power distribution apparatus; electric power distribution machines; electrical distribution systems, namely, power distribution panels; charging stations for electric vehicles; photovoltaic modules, namely, an assembly of photovoltaic cells; electrical, electronic and computer equipment for wind mills, for wind power plants, for wind turbines, and for other wind-operated machines, namely, computers, computer hardware, and electrical controllers; electronic controllers and electronic monitors for automatically turning on or off the generator and for automatic restarting after public power-line break-downs; apparatus for overvoltage protection against strokes of lightning, namely, voltage surge protectors and arrestors for overvoltage protection against lightning strikes; vibration sensors for mounting on windmill housings; structural parts and fittings for all the aforesaid goods, namely, regulatorsACTIVE—
011Wind power plants; hydro energy sources, namely, run of the river hydroelectric power plants; solar energy receivers; energy storage plants; alternative energy generation power plants; solar energy based cooling apparatus; solar energy collectors for heating; solar-energy-powered heating installations; heat pumps for energy processing; energy recovery ventilators; solar thermal collectors; portable utility lights, namely, battery-powered incandescent emergency lighting units; hydrogen generators; hydrogen-generation equipment and components, namely, hydrogen generators, hydrogen purifiers, hydrogen purification membranes, fuel processors, and steam reformers; hydrogen generators for industrial purposes; hydrogen generation plants using steam reforming; steam reformers for use in generating hydrogen gas; solar cell lighting apparatus, namely, lighting installations; solar thermal installations, namely, solar thermal modules; power plants; photovoltaic-based power plants; solar-powered cooling units; solar powered ventilation apparatus; solar thermal-based power plants; carbon monoxide generation plants for industrial purposes; carbon dioxide generation plants for industrial purposes; environmental control apparatus, namely, particle activators for use in soil remediation, drinking water treatment, municipal and industrial wastewater treatment; cooling machines, installations, apparatus, and instruments, namely, water coolers, coolers based on other liquids than water in the nature of cooling units for industrial purposes, and solar-energy-based cooling apparatus for wind turbines and for generators for wind turbines; heating machines, installations, apparatus, and instruments, namely, heating instruments and apparatus in the nature of solar collectors for use with wind turbines; solar collectors for heating; air cooling apparatus and instruments, namely, evaporative charge air coolers for wind turbines and for generators for wind turbines; heat exchangers, other than parts of machines; heating elements embedded in blades for wind mills, in wind power plants, in wind turbines, and in other wind-operated machines; solar photovoltaic collector panelsACTIVE—
035Advertising and business services, namely, business management, business administration, and providing general office functions in relation to energy production and energy recycling; business venture development and formation consulting services for the renewable energy industry; business consulting and advisory services in the field of energy efficiency; energy management services, namely, providing a service that allows customers to purchase energy, namely, electricity, natural gas and renewable energy; energy usage management information services; retail energy provider services that allow customers to purchase renewable electrical energy; consultation in the field of energy efficiency; energy management services, namely, providing a service that allows customers to purchase energy, namely, electricity, natural gas and renewable energy, at a fixed price; energy management services, namely, providing a service that allows customers to purchase energy from various energy providers; import-export agency services in the field of energy; consulting services in the field of energy usage management and energy efficiency; providing on-line and on-location home energy assessment services for the purpose of determining energy efficiency or usage management through the use of energy audits, and consulting services in the field of business-customer energy usage management and providing information regarding methods for reducing energy usage to promote energy efficiency; information in the field of energy efficiency; consulting and advisory services in the field of energy efficiency; consulting services in the fields of energy consumption and usage conservation to improve energy efficiency; retail electricity provider services, namely, providing a service that allows customers to purchase energy; providing information in the field of energy efficiency; technical consultancy in the field of energy saving and energy efficiency; conducting business research projects in relation to wind turbines, wind power plants, and other wind-powered machinesACTIVE—
036financing of development of renewable energy generation facilities, the foregoing limited to solar power generation, wind power generation, hydroelectric power generation, green hydrogen power generation, non-renewable power generation, afforestation, and carbon credit brokerageACTIVE—
037Installation, repair, and maintenance of energy conversion apparatus and power plants, and consultancy and information in connection with the foregoing; installation of energy saving apparatus, namely LED's and Power Quality improvement equipments, and consultancy and information in connection with the foregoing; repair of energy supply installations, and consultancy and information in connection with the foregoing; installation of renewable energy generation equipment, and consultancy and information in connection with the foregoing; installation, maintenance, and repair of windmills and wind turbines, and consultancy and information in connection with the foregoing; erection, installation, maintenance, and repair of wind turbines, wind stations, and other wind-powered machines, and consultancy and information in connection with the foregoing; construction of wind turbines, wind stations, and other wind-powered machines, and consultancy and information in connection with the foregoing; consultancy and information in connection with the construction of wind turbines, wind stations, and other wind-powered machines; construction project management services in the field of construction of renewable energy and energy generation equipment support structures and ancillary structures for supporting meteorological data gathering equipment; plant construction, plant maintenance, and construction project management services, all for businesses in the energy production sector; repair and installation services, namely, the installation of heating, cooling, and environmental-control systems primarily using solar energy, renewable energy resources, and rainwater; installation, maintenance, and repair of solar installations for generating power, of solar collectors, and of photovoltaic modules; erection, installation, maintenance, and repair of windmills, wind power plants, wind turbines, and other wind-operated machines; repair or maintenance of power distribution or control machines and apparatus; providing information relating to the repair or maintenance of power distribution or control machines and apparatus; charging station services for electric vehicles; plant construction, maintenance, and construction project management services for businesses in the energy production and transmission sector; construction services, namely, planning, laying out, and construction of photovoltaic arrays, systems, and subsystems; installation of solar panels and solar power systems; providing information in the field of construction of solar panels and solar power systems; construction, installation, and repair of heating and power generation equipment and gas and electric appliances and transmission lines; pipeline construction and maintenance; construction, maintenance, and repair of electricity generating plants; extraction of oil, gas, coal, water, or other natural resources in the nature of solar, wind, hydro, all for manufacturing of power and energy products; construction, repair, and installation services of wind turbine generators in relation to the production of energy from wind energy; consultancy relating to the construction, installation, and maintenance of wind power production facilities; construction planning of wind turbines, wind power plants, wind-powered machines, and components therefor; technical construction planning of photovoltaic installations and solar energy systemsACTIVE—
039Electricity distribution services; storage, distribution, and supply of energy and fuels; distribution of renewable energy; distribution and transmission of electricity; energy distribution; supply of electrical energy, gas, water, and district heating; providing information on chemical storage of energy via a website; transportation, distribution, and storage of mineral-based fuels, diesel fuels, and other fuels, including by pipeline; electricity distribution; electricity storage; electricity supply services; public utility services in the nature of electricity distribution; electric power supply and distributionACTIVE—
040Services of energy generation; energy production; energy recycling services; rental of energy generating equipment; transformation of energy, namely, generation of energy by converting wind, solar, hydro into electrical power; custom fabrication of wind turbines, wind stations, and other wind-powered machines; consultancy and information in connection with the custom fabrication of wind turbines, wind stations, and other wind powered machines; production of electrical energy from renewable sources; energy generation services; energy production services; provision of information, advice, and consultancy in relation to the production of energy, and the treatment, recycling, transformation, and incineration of waste; energy recycling services, namely, capturing and conversion of wasted energy into electricity and useful steam; generation of energy from renewable resources, namely, wind, hydro, solar, and geothermal energy sources; generation of energy from natural gas and coal; electricity generation; production of electricityACTIVE—
042Energy auditing; design and development of energy-management software and of energy distribution computer networks; scientific research in the field of energy; technical engineering assistance, consultancy, and information relating to wind-turbine and wind-power projects, and implementation of the aforesaid projects; construction drafting and testing of wind turbines, wind power plants, wind-powered machines, and components therefor; conducting scientific research projects in relation to wind turbines, wind power plants, and other wind-powered machines, and providing technical engineering assistance, consultancy, and information with regard to the development and testing of wind turbines, wind power plants, wind-powered machines, and components therefor; technical engineering consultancy and information relating to the setting up, construction, installation, maintenance, and repair of wind turbines, wind stations, and other wind-powered machines; scientific research in the field of renewable energy; technological planning and consulting services in the field of renewable energy resources; technological consultancy in the fields of energy production and use; research and development of environmentally-friendly forms of energy and power; research and development services relating to solar cells and electricity generation; design of power plants; design of solar photovoltaic systems; technical research in the field of energy production and energy saving; technological planning of photovoltaic installations and solar energy systems; quality control for others of solar panels; quality control for others of the layout, construction, and operation of solar panels and photovoltaic arrays; technical assistance concerning wind-mill and wind-power projects and developing such projects, namely, consultation concerning the design and development of wind mills and wind-power plant projects; development and testing for others of wind mills, wind-power plants, wind turbines, wind-operated machines, and components therefor; technical research projects for others concerning wind mills, wind-power plants, wind turbines, and other wind-operated machines; advisory, consultancy, and information services relating to all the aforesaid servicesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 29, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 29, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 23, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 1, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 1, 2026GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Sep 1, 2026XAECEXAMINER'S AMENDMENT ENTERED—
Sep 1, 2026GNEAEXAMINERS AMENDMENT E-MAILED—
Sep 1, 2026CNEAEXAMINERS AMENDMENT -WRITTEN—
Sep 1, 2026ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Aug 3, 2026OTHECASE RETURNED TO EXAMINATION—
Aug 3, 2026IUCNNOTICE OF ALLOWANCE CANCELLED—
Aug 23, 2024JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY—
Aug 23, 2024PCBGPETITION TO DIRECTOR - CHANGE BASIS - GRANTED—
Aug 23, 2024APETASSIGNED TO PETITION STAFF—
Jul 22, 2024TPADTEAS PETITION TO AMEND BASIS RECEIVED—
Jan 23, 2024NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Nov 28, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 28, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 8, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 25, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 16, 2023XAECEXAMINER'S AMENDMENT ENTERED—
Oct 16, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Oct 16, 2023GNEAEXAMINERS AMENDMENT E-MAILED—
Oct 16, 2023CNEAEXAMINERS AMENDMENT -WRITTEN—
Sep 28, 2023XAECEXAMINER'S AMENDMENT ENTERED—
Sep 28, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Sep 28, 2023GNEAEXAMINERS AMENDMENT E-MAILED—
Sep 28, 2023CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 29, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 28, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 28, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 25, 2023XELGAPPLICATION EXTENSION GRANTED/RECEIPT PROVIDED—
May 25, 2023XELRAPPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED—
Feb 28, 2023GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 28, 2023GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 28, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 27, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 26, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 26, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 26, 2022GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 26, 2022GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 26, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 21, 2022DOCKASSIGNED TO EXAMINER—
Nov 9, 2021NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 29, 2021NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance