USPTO serial 97106315
PEOPLE FIRST
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- —
- Examiner
- DUBIN, DAVID I
- Law office
- TMEG LAW OFFICE 107 - EXAMINING ATTORNEY ASSIGNED
What this means
These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.
Need help with PEOPLE FIRST?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Scott E. Brenner
Scott E. Brenner THOMAS P. HOWARD, LLC842 W. SOUTH BOULDER RD.SUITE 100LOUISVILLE, CO 80027Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 025 | Shirts; Tops as clothing; Hats | ACTIVE | Jan 1, 2014 |
| 037 | General building contractor services; commercial building construction and industrial electrical contracting services; construction of wind power plants; construction project management, project controls, reporting services, quality control, and environmental management and environmental compliance, namely, construction project management services; construction services in the nature of foundation and civil construction, namely, building construction services; distribution construction services for overhead and underground distribution lines, namely, building construction services; electrical substation construction and maintenance services, namely, building construction services; electrical construction for wind farms and solar energy facilities, namely, building construction services; electrical contracting; electrical contractor services; electricity transmission construction services, namely, building construction services; emergency restoration services for utilities in the nature of electricity transmission systems, namely, installation of utilities in construction sites; engineer-procure-construct services, namely, building construction services; pre-construction services in the nature of budgeting, constructability reviews, construction scheduling, advance purchasing, and price modeling, namely, building construction services; general building contractor services; installation and maintenance of solar energy based power plants; installation and maintenance of transportation and traffic equipment and systems; installation of utilities in the nature of electricity transmission and distribution systems in construction sites; plant construction, maintenance and construction project management services for businesses in the energy production and transmission sector; rental of construction and building equipment; rental of equipment for the construction and maintenance of electrical transmission and distribution equipment, repair and maintenance of power plants, namely, rental of construction equipment; repair services for electric generators and wind turbines; transportation construction services in the nature of construction of overhead and underground electrical installations, traffic signal intersections for traffic management systems, intelligent transportation systems, light rail signalization and street lighting services, namely, building construction services | ACTIVE | Jan 1, 2014 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 2, 2024 | MAB0 | ABANDONMENT NOTICE MAILED - INCOMPLETE RESPONSE | — |
| Jan 2, 2024 | MAB0 | ABANDONMENT NOTICE E-MAILED - INCOMPLETE RESPONSE | — |
| Jan 2, 2024 | ABN0 | ABANDONMENT - INCOMPLETE RESPONSE | — |
| Sep 7, 2023 | XELG | APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED | — |
| Sep 7, 2023 | XELR | APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED | — |
| Jun 7, 2023 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Jun 7, 2023 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jun 7, 2023 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jun 6, 2023 | NREV | NOTICE OF REVIVAL - E-MAILED | — |
| Jun 5, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 5, 2023 | PETG | PETITION TO REVIVE-GRANTED | — |
| Jun 5, 2023 | PROA | TEAS PETITION TO REVIVE RECEIVED | — |
| Apr 4, 2023 | MAB2 | ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Apr 4, 2023 | MAB2 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Apr 4, 2023 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Aug 26, 2022 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 26, 2022 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 26, 2022 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 12, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 24, 2021 | AMPX | PRELIMINARY/VOLUNTARY AMENDMENT - ENTERED | — |
| Nov 22, 2021 | ALIE | ASSIGNED TO LIE | — |
| Nov 18, 2021 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |
| Nov 13, 2021 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 6, 2021 | NWAP | NEW APPLICATION ENTERED | — |