Drawing for CLEVER ENERGY

USPTO serial 97162830

CLEVER ENERGY

Reviewed by CopyMark Law Group

Reg. 7637237Status 700Registered
Filing date
Status date
Registration date
Jan 7, 2025
Examiner
SMITH, TARYN E
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with CLEVER ENERGY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Charles T. J. Weigell

Charles T. J. Weigell FROSS ZELNICK LEHRMAN & ZISSU, P.C.151 W. 42ND STREET, 17TH FLOORNEW YORK, NY 10036United States

Goods and services

ClassDescriptionStatusFirst use
009Downloadable software for process tracking and management, availability tracking, reliability reports, optimization, and improving energy efficiency of electric power in industrial, tertiary and residential buildings, in infrastructures and data centers, in industrial machines, plants, power grids and power plant processes; computer internet network server and intranet network servers for providing data and recorded software for data management in the field of energy efficiency, energy sustainability and management, availability, reliability and optimization of electric power; electronic databases in the fields of power management, process management and security management in industrial, tertiary and residential buildings, in infrastructures and data centers, in industrial machines, plants, power grids and power plant processes recorded on computer media; computer hardware and recorded computer software for controlling power plants in the field of electrical distribution, industrial control and automation, electrical supply systems for computers; building and home electrical power automation systems comprising wireless and wired controllers, touch screens, controlled devices being computer hardware, and downloadable software for automating appliances, lighting, HVAC, building and home entertainment devices, security and other building and home electrical power monitoring and control applications being lighting systems; computers, recorded software, microprocessors and microcommands being microprocessors, all for the analysis, protection, inspection, measurement, signaling, regulation, setting, monitoring, maintaining, supervision, design, management, control and remote control of lighting, heating, cooling, humidifying, ventilating, and air-conditioning units, building energy consumption systems, fire safety devices, access control and energy management systems; downloadable cloud-based computer software for information management, data collection and data analysis in the fields of asset optimization, industrial automation, machine diagnostics, and optimization of industrial, manufacturing and infrastructure management processesACTIVE—
016Printed instructional and teaching materials in the field of power plants and energy management; printed booklets, manuals and brochures in the field of power plants and energy management; printed computer program manuals for energy conservation, operating power plants; printed power plant operating instruction manuals; printed matter being books, printed columns and articles in the field of energy conservations; printed images being graphic art prints and photographs; graphic art reproductions; printed books and publications being newsletters in the field of energy conservation; educational publications, namely, printed training manuals in the field of power plant operations and energy management and conservation; promotional material being printed advertising boards of cardboard; printed forms; printed educational guides, printed seminar notes and compilations being newsletters in the field of energy management; printed advertising and publicity literature being printed advertising signs of paper; printed catalogues in the field of energy management devices; printed informational flyers, pamphlets, booklets, reports, hoarding signs of paper in the field of energy management; printed advertisement boards of paper and cardboard; printed stationery letter head writing paper; printed calendars and diariesACTIVE—
035Commercial, industrial, business process and resource planning, namely, business management assistance and consulting in the field of managing cost intelligently by providing business driving efficiency consulting and optimization; business consultation services in the field of business process improvement and enterprise architecture design development; Business management assistance, advisory services, and consultancy with regard to business planning, business management analysis, business management, and business organization related to minimizing energy cost by collecting energy data; business management and enterprise organization consultancy; cost price analysis by analyzing energy consumption data; compilation and systemization of information into computer databases; computerized file management; business consulting and advisory services in the fields of energy usage measurement, energy consumption, energy distribution and energy efficiency for buildings automation and automated systems installations and equipment; business consulting and expert reports relating to business matters in the fields of electrical energy usage management and building management; monitoring of energy consumption for others for accounting purposes; technical studies in the nature of preparing business reports and business advisory services all in the field of energy consumption distribution; technical business evaluations and business appraisals in the field of energy consumptionACTIVE—
042Architectural design and computer software development for power plants; analysis of the service of others to determine conformity with certification standards in the field of the availability, reliability and optimization of electric power in industrial, tertiary and residential buildings, in infrastructures and data centers, in industrial machines, power plants, power grids and energy manufacturing processes; measurement evaluations and electric monitoring of power grids in the field of the availability, reliability and optimization of electric power in industrial, tertiary and residential buildings, in infrastructures and data centers, in industrial machines, power plants, power grids and energy manufacturing processes, all to ensure proper functioning; design and development of industrial machines; analysis of the services of others to determines conformity with certification standards in the fields of energy efficiency and energy sustainability in industrial, tertiary and residential buildings, in infrastructures and data centers, in industrial machines, power plants, power grids and energy manufacturing processes; measurement evaluations and electronic monitoring of power grids all in the fields of energy efficiency and energy sustainability in industrial, tertiary and residential buildings, in infrastructures and data centers, in industrial machines, power plants, power grids and energy manufacturing processes, all to ensure proper functioning; design and development of wired and wireless computer networks; product research and development and conducting of scientific feasibility studies of technical projects and work being new products in the fields of electrical energy management, building management and home automation for environmental protection purposes; materials testing in the fields of electrical energy management and building management; software as a service (SAAS) services featuring software for controlling integrated power racks that convert and transform power to the requirements of the equipment and connected systems; Design of information technology and computer technology systems being computer hardware; computer programming services for home automation installations and programmable automated systems and technical management installations in the nature of HVAC management systems for buildings; technical consulting services in the fields of datacentre architectureACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 7, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jan 7, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 19, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 19, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 13, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 16, 2024ATRVATTORNEY REVIEW COMPLETED—
Oct 16, 2024OTHECASE RETURNED TO EXAMINATION—
Oct 16, 2024IUCNNOTICE OF ALLOWANCE CANCELLED—
Oct 10, 2024ATRQATTORNEY REVIEW/DECISION ON AMENDMENT REQUIRED—
Oct 10, 2024PCBGPETITION TO DIRECTOR - CHANGE BASIS - GRANTED—
Sep 27, 2024APETASSIGNED TO PETITION STAFF—
Sep 4, 2024TPADTEAS PETITION TO AMEND BASIS RECEIVED—
Aug 27, 2024EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Aug 27, 2024EX2GSOU EXTENSION 2 GRANTED—
Aug 26, 2024AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Jun 29, 2024TPEXSOU EXTENSION RECEIVED WITH TEAS PETITION—
Jun 29, 2024NREVNOTICE OF REVIVAL - E-MAILED—
Jun 29, 2024PETGPETITION TO REVIVE-GRANTED—
Jun 29, 2024PROATEAS PETITION TO REVIVE RECEIVED—
Jun 27, 2024EXT2SOU EXTENSION 2 FILED—
Dec 20, 2023EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Dec 18, 2023EX1GSOU EXTENSION 1 GRANTED—
Dec 18, 2023EXT1SOU EXTENSION 1 FILED—
Dec 18, 2023EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jun 27, 2023NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
May 2, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 2, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 12, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 27, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 27, 2023XAECEXAMINER'S AMENDMENT ENTERED—
Mar 27, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Mar 27, 2023GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 27, 2023CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 17, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 16, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 16, 2023ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Mar 8, 2023GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Mar 8, 2023GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 8, 2023CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jan 12, 2023DOCKASSIGNED TO EXAMINER—
Nov 23, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 22, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 22, 2022TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 24, 2022GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 24, 2022GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 24, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 14, 2022DOCKASSIGNED TO EXAMINER—
Apr 19, 2022AMPXPRELIMINARY/VOLUNTARY AMENDMENT - ENTERED—
Apr 15, 2022ALIEASSIGNED TO LIE—
Apr 12, 2022PARITEAS VOLUNTARY AMENDMENT RECEIVED—
Dec 14, 2021NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 11, 2021NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance