USPTO serial 97166187
BERGAUF
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Mar 14, 2023
- Examiner
- ZARICK, DIANA G
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with BERGAUF?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Bergauf Constructions Technologies Limited
Sverdlovsk region, RU
Other trademarks owned by Bergauf Constructions Technologies Limited
Bergauf Constructions Technologies Limited
Sverdlovsk region, RU
Other trademarks owned by Bergauf Constructions Technologies Limited
Bergauf Constructions Technologies Limited
Sverdlovsk region, RU
Other trademarks owned by Bergauf Constructions Technologies Limited
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Alexander Lazouski
Alexander Lazouski LAZOUSKI IP LLCSUITE 1, 14726 BOWFIN TER.LAKEWOOD RANCH, FL 34202UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 001 | Agglutinants for concrete; adhesives for wall tiles; adhesives for industrial purposes; cement-waterproofing preparations in the nature of chemicals, chemical compositions, except paints; chemical compositions for repairing leaks; elements for waterproofing, namely, waterproofing chemical compositions | ACTIVE | — |
| 002 | Primers; badigeon in the nature of cement fillers; road coating materials, namely, concrete moisture barrier coatings; coatings, namely, coatings comprised of cement | ACTIVE | — |
| 017 | Non-conducting materials for retaining heat, namely, building insulation; substances for insulating buildings against moisture; insulating fabrics; road coating materials, namely, insulating coatings; elements for waterproofing, namely, insulating waterproofing membranes | ACTIVE | — |
| 019 | Tar; thin wooden materials, namely, building materials in the nature of thin semi-worked woods, wood veneer; road coating materials, namely, tar coatings for use on road pavements, asphalt-based coating for use on road pavements; materials for making and coating roads, namely, polymeric bitumen emulsions for road surfaces, road asphalt, concrete; fireclay; building materials, namely, lime building materials, gypsum building materials, cement building materials; coatings, namely, tar coatings for use on roofs, walls and pavements; grout; cement; elements for waterproofing, namely, waterproofing membranes for roofing, floors and walls; Non-conducting materials for retaining heat, namely, insulating glass for building | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Bergauf Constructions Technologies Limited
- Other trademarks owned by Bergauf Constructions Technologies Limited
- Other trademarks owned by Bergauf Constructions Technologies Limited
- Other trademarks in Class 001
- Other trademarks in Class 002
- Other trademarks in Class 017
- Other trademarks in Class 019
- Similar marks named BERGAUF
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 14, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Mar 14, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Dec 27, 2022 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 27, 2022 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 7, 2022 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Nov 22, 2022 | FIXD | ELECTRONIC RECORD REVIEW COMPLETE | — |
| Nov 18, 2022 | ERRR | ON HOLD - ELECTRONIC RECORD REVIEW REQUIRED | — |
| Nov 12, 2022 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 9, 2022 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 8, 2022 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 8, 2022 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 21, 2022 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 21, 2022 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 21, 2022 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 19, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 16, 2021 | MDSC | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Dec 15, 2021 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 14, 2021 | NWAP | NEW APPLICATION ENTERED | — |