Drawing for SIMBA

USPTO serial 97219558

SIMBA

Reviewed by CopyMark Law Group

Reg. 7302037Status 700Registered
Filing date
Status date
Registration date
Feb 13, 2024
Examiner
CHADAB, SETH WILLIG
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with SIMBA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Kent Dallow

Kent Dallow Quarles & Brady LLP8744 Kendrick Castillo Way, Suite 560Highlands Ranch, CO 80129United States

Goods and services

ClassDescriptionStatusFirst use
007Construction and rock excavation and tunneling machines and equipment, namely, tunnel boring machines, road building machines, drill rigs; rock cutting and shredding machines and equipment; Construction and mining equipment, namely, mobile drilling rigs and parts and fittings for mobile drilling rigs; rock excavation machines; earth drilling machines and rock drilling machine; Drilling rigsACTIVE—
009Electronic control systems for machines; Battery packs; battery charging devices for vehicles; vehicle drive train simulators; simulators for underground loading applicationsACTIVE—
012Vehicles and conveyances, namely, terrain vehicles and underground vehicles; land vehicles for construction, rock excavation and tunneling and structural parts and fittings for land vehicles and vehicles for construction, rock excavation and tunneling; Vehicles and conveyances, namely, vehicles for mobile drilling rigs and parts and fittings for vehicles and conveyances for mobile drilling rigs; electric land vehicles for construction, rock excavation and tunneling; unmanned conveying land vehicles; unmanned land vehicles for construction, rock excavation and tunneling; remotely controlled and operated land vehicles for construction, rock excavation and tunneling; parts and fittings for vehicles and conveyances, namely, ball joints, structural parts for trucks, body panels for trucksACTIVE—
037Installation, repair and maintenance of construction and rock excavation and tunneling machines and equipment, rock cutting and shredding machines and equipment, construction and mining equipment, namely, mobile drilling rigs and parts and fittings for mobile drilling rigs, rock excavation equipment, earth drilling machines and rock drilling machine, drilling rigs; Installation, repair and maintenance of vehicles and conveyances, namely, land vehicles for construction, rock excavation and tunneling and structural parts and fittings for land vehicles and vehicles for construction, rock excavation and tunneling, unmanned conveying vehicles, unmanned vehicles, remotely controlled and operated land vehicles and parts and fittings for vehicles and conveyances; Installation, repair and maintenance of electronic control systems for machines, Battery packs, battery charging devices for vehicles, vehicle drive train simulators, simulators for underground loading applicationsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 4, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Feb 4, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 4, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Feb 13, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Feb 13, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 28, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 28, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 8, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 12, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 12, 2023XAECEXAMINER'S AMENDMENT ENTERED—
Oct 12, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Oct 12, 2023GNEAEXAMINERS AMENDMENT E-MAILED—
Oct 12, 2023CNEAEXAMINERS AMENDMENT -WRITTEN—
Oct 4, 2023XAECEXAMINER'S AMENDMENT ENTERED—
Oct 4, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Oct 4, 2023GNEAEXAMINERS AMENDMENT E-MAILED—
Oct 4, 2023CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 23, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 23, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 23, 2023CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Aug 22, 2023ALIEASSIGNED TO LIE—
Apr 10, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 24, 2023TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Mar 24, 2023ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 24, 2023REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Oct 12, 2022GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 12, 2022GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 12, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 4, 2022DOCKASSIGNED TO EXAMINER—
Jan 20, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 18, 2022NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance