Drawing for CURAPIPE

USPTO serial 97284529

CURAPIPE

Reviewed by CopyMark Law Group

Status 606
Filing date
Status date
Registration date
—
Examiner
NKOJO,RHODA K
Law office
INTENT TO USE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with CURAPIPE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Justin Lampel

Justin Lampel LAMPEL LAW, P C555 SKOKIE BLVD., SUITE 500NORTHBROOK, IL 60062United States

Goods and services

ClassDescriptionStatusFirst use
001Chemical preparations for sealing pipes and pipelines; industrial adhesives for sealing pipes; Chemical preparations for use in industry, namely, for pipeline repair and maintenance, for water, oil or gas pipelines; Chemical preparations, in the form of industrial polymers, namely, for pipeline repair and maintenance, for water, oil or gas pipelines; Chemical preparations for stopping up holes and cracks in pipelines and pipeline networks, namely, for pipeline repair and maintenance, for water, oil or gas pipelines; Adhesive chemicals for improving the performance and duration of chemical products for use in industry; Chemical additives for use as binding agents in fillersACTIVE—
037Pipeline maintenance; Pipeline maintenance services; Repairing of pipes; repairing corrosive or leaking pipes; repair of pipelines; Maintenance and repair of water, gas or oil pipelines supplying residential, commercial, industrial and governmental buildings and facilities; Pipeline integrity services, namely, pipeline maintenance services related to maintaining the integrity of a pipeline using piggable pipeline toolsACTIVE—
042Pipeline integrity services, namely, pipeline inspection, testing and analysis services related to maintaining the integrity of a pipeline using piggable pipeline tools; Scientific and technological services, namely, scientific research, analysis and testing in the fields of curing pipeline cracks and leaks and developing compositions and formulations for curing pipeline cracks and leaks; Scientific and technological services, namely, research and design, in the fields of modelling pipeline network leaks and detecting pipeline network leaks by detecting changes in measured parameters; Product development for others related to developing compositions and formulations for curing pipeline cracks and leaks; Pipeline inspection services related to detecting pipeline network leaks by detecting changes in measured parameters; Industrial research in the field of developing formulations for curing pipeline leaks in subterranean pipeline networks; Pipeline inspection services; Inspection of pipes; Testing of water, oil and gas pipelines supplying residential, commercial, industrial and governmental buildings and facilitiesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB6): The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.

DateCodeEventWhat it means
Jan 19, 2026MAB6ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Jan 19, 2026ABN6ABANDONMENT - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Sep 15, 2025EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jun 10, 2025EX4GSOU EXTENSION 4 GRANTED—
Jun 9, 2025EXT4SOU EXTENSION 4 FILED—
Jun 9, 2025EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Dec 9, 2024EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Dec 9, 2024EX3GSOU EXTENSION 3 GRANTED—
Dec 9, 2024EXT3SOU EXTENSION 3 FILED—
Dec 9, 2024EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jun 13, 2024EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jun 3, 2024EX2GSOU EXTENSION 2 GRANTED—
Jun 3, 2024EXT2SOU EXTENSION 2 FILED—
Jun 3, 2024EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Dec 12, 2023EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Dec 10, 2023EX1GSOU EXTENSION 1 GRANTED—
Dec 10, 2023EXT1SOU EXTENSION 1 FILED—
Dec 10, 2023EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jun 13, 2023NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Apr 18, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 18, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 29, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 16, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 10, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 9, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 9, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 14, 2022GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 14, 2022GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 14, 2022CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 6, 2022DOCKASSIGNED TO EXAMINER—
Mar 3, 2022MDSMNOTICE OF DESIGN SEARCH CODE E-MAILED—
Mar 2, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—

Frequently asked questions

Related guidance