USPTO serial 97294643
CARBON RE
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Jan 14, 2025
- Examiner
- JACKSON, STEVEN W
- Law office
- FILE REPOSITORY (FRANCONIA)
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with CARBON RE?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Joshua M. Gerben, Esq.
Joshua M. Gerben, Esq. Gerben Perrott, PLLC1050 Connecticut Ave NWSuite 500Washington, DC 20036Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Downloadable computer software using artificial intelligence for analyzing cement plant data to optimize energy use and production, for designing novel industrial processes and speeding up the development of new climate-friendly materials; downloadable software for use with intelligent gateways for real-time data analysis, for connecting, operating, and managing networked cement plant computers, devices, and machines in the internet of things; downloadable software for environmental monitoring; downloadable software for analyzing data produced in cement plants to identify the key parameters affecting energy intensity, for simulating the chemical and physical processes in a plant, for analyzing feed rates, sensor data, and control parameters to provide clear quantified recommendations to reduce the mass of CO2 | ACTIVE | — |
| 042 | Software as a service (SAAS) services featuring software for use with intelligent gateways for real-time data analysis, for connecting, operating, and managing networked cement plant computers, devices, and machines in the internet of things, for environmental monitoring, for analyzing data produced in cement plants to identify the key parameters affecting energy intensity, for simulating the chemical and physical processes in a plant, for analyzing feed rates, sensor data, and control parameters to provide clear quantified recommendations to reduce the mass of CO2; software as a service (SAAS) services featuring software using artificial intelligence for analyzing cement plant data to optimize energy use and production, for designing novel industrial processes and speeding up the development of new climate-friendly materials; consultancy in the field of artificial intelligence technology; research in the field of artificial intelligence technology; scientific research; providing technological and scientific information about environmentally-conscious and green innovations; greenhouse gas emission measuring and analysis; monitoring of greenhouse gas emissions for scientific research purposes; technology advisory services related to emissions reduction; measurement and verification of carbon dioxide and other greenhouse gas emission offsets; technological and scientific consultation services in the field of measurement and verification of carbon dioxide and other greenhouse gas emission offsets; consulting services in the fields of energy measurement to improve energy efficiency; development and creation of computer programmes for data processing in the field of greenhouse emissions and energy efficiency; technological planning and consulting services in the field of renewable energy; research in the field of climate change, greenhouse gas mitigation programmes, and emission reduction projects; technological and scientific consultancy services in the field of climate change, greenhouse gas mitigation programmes, and emission reduction projects; providing scientific information in the field of the reduction of carbon emissions, greenhouse gas emission measuring and analysis, measurement and verification of carbon dioxide and other greenhouse gas emission offsets; providing scientific information in the fields of climate change and global warming; scientific research consulting in the field of environmental pollution, environmental protection; consulting services in the field of environmental assessment and planning; research in the field of environmental protection; scientific research consulting in the field of industrial and energy processes, the design of industrial infrastructure and equipment, and the development of materials | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 14, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jan 14, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 17, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 17, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 28, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 15, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 14, 2024 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Aug 14, 2024 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Aug 14, 2024 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Aug 14, 2024 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Aug 2, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 2, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 2, 2024 | ALIE | ASSIGNED TO LIE | — |
| Feb 15, 2024 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| Dec 13, 2023 | GNS2 | NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED | — |
| Dec 13, 2023 | GNSI | INQUIRY TO SUSPENSION E-MAILED | — |
| Dec 13, 2023 | CNSI | SUSPENSION INQUIRY WRITTEN | — |
| Dec 13, 2023 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Mar 21, 2023 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Mar 21, 2023 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Mar 21, 2023 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Mar 16, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 16, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 16, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 23, 2022 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 23, 2022 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 23, 2022 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 16, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 8, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 7, 2022 | NWAP | NEW APPLICATION ENTERED | — |