USPTO serial 97334016
HYGRID
Reviewed by CopyMark Law Group
Status 606
- Filing date
- Status date
- Registration date
- —
- Examiner
- BARANDAO, CHERISE DESIRIMA
- Law office
- INTENT TO USE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with HYGRID?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Chad D. Tillman
Chad D. Tillman TILLMAN WRIGHT, PLLCPO BOX 49309CHARLOTTE, NC 28277United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Apparatus and instruments for monitoring and controlling energy generation, transformation, distribution, and storage, namely, data aggregators, computers, inverters, storage devices, transformers, meters, reclosers, real time automation controllers, weather stations, electrical vehicle charging stations, and wind energy generation equipment; Apparatus and instruments for monitoring and controlling energy generation, transformation, distribution, and storage at facilities and aggregates of those facilities, namely, data aggregators, computers, inverters, storage devices, transformers, meters, reclosers, real time automation controllers, weather stations, electrical vehicle charging stations, and wind energy generation equipment; Electric control devices for solar power generation systems that monitor generation of system and control output of solar inverters; Electric control devices for integration and control of electric power generation sources that monitor the output of the system, monitor the integration with the grid, and allow control of the output and characteristics of the energy generated; Electric control devices for microgrids that monitor all resources on the microgrid and control and dispatch the microgrid to create a specific output profile; Electric control devices for aggregating power generated from microgrids; Electric controllers comprising computers, meters, reclosers, and real time automation controller hardware and downloadable software for use in the field of renewable energy generation and storage for monitoring and controlling the function and status of microgrids; Equipment for operating a microgrid, namely, computers, meters, reclosers, and real time automation controller and downloadable software for monitoring and controlling operation of microgrids; Electric control devices for integration and control of energy storage sources; Electric control devices for integration with energy markets. | ACTIVE | — |
| 042 | Design and development of energy microgrids and utility-scale renewable energy power plants; consulting services in the field of design of renewable energy microgrids, utility-scale renewable energy power plants, or aggregates of microgrids and power plants; design and development of sustainable energy microgrids, utility-scale sustainable energy power plants, or aggregates of microgrids and power plants; Technological planning and consulting services in the field of renewable energy microgrids; Technological planning and consulting services in the field of utility-scale renewable energy power plants; Technological planning and consulting services in the field aggregates of microgrids and power plants; Design and engineering of electric power control and automation systems; Design and engineering of electric power system transmission and distribution units; Design and engineering of power distribution or transmission system control, protection, automation and monitoring systems; Engineering services in the field of renewable electric power systems; Design and engineering of electric power microgrid control and automation systems; Design and engineering of systems to control and automate integration of electric power generation sources; Providing an interactive website enabling users to access information in the field of electrical generation assets and generate reports regarding the operation of microgrids. | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by ADERIS ENERGY, LLC
- Other trademarks owned by ADERIS ENERGY, LLC
- Other trademarks owned by Solar Operations Solutions, LLC
- Other trademarks in Class 009
- Other trademarks in Class 042
- Similar marks named HYGRID
- Prosecution event MAB6 explained
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 2, 2026 | MAB6 | ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Mar 2, 2026 | ABN6 | ABANDONMENT - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Jul 17, 2025 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jul 16, 2025 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Jul 16, 2025 | EXT4 | SOU EXTENSION 4 FILED | — |
| Jul 16, 2025 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Mar 4, 2025 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jan 17, 2025 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Jan 16, 2025 | EXT3 | SOU EXTENSION 3 FILED | — |
| Jan 16, 2025 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Apr 11, 2024 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Apr 10, 2024 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Apr 10, 2024 | EXT2 | SOU EXTENSION 2 FILED | — |
| Apr 10, 2024 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Nov 7, 2023 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Nov 3, 2023 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Nov 3, 2023 | EXT1 | SOU EXTENSION 1 FILED | — |
| Nov 3, 2023 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jul 25, 2023 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| May 30, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 30, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 10, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Apr 27, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 2, 2023 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Feb 2, 2023 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Feb 2, 2023 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Feb 2, 2023 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jan 18, 2023 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Jan 11, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 1, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 31, 2022 | NWAP | NEW APPLICATION ENTERED | — |