Drawing for ENGINEERED FOR IMPACT

USPTO serial 97350190

ENGINEERED FOR IMPACT

Reviewed by CopyMark Law Group

Reg. 7663317Status 700Registered
Filing date
Status date
Registration date
Jan 21, 2025
Examiner
SWAIN, MICHELE LYNN
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with ENGINEERED FOR IMPACT?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Eric R. Moran

Eric R. Moran MCDONNELL BOEHNEN HULBERT & BERGHOFF LLP300 SOUTH WACKER DRIVE31ST FLOORCHICAGO, IL 60606

Goods and services

ClassDescriptionStatusFirst use
035Consulting services in the field of energy usage management and energy efficiency; business project management services for construction projectsACTIVE—
037Construction project management services; providing technical support, namely, technical advice concerning the installation, repair and maintenance of electric or electronic apparatus, equipment and devices used for automated or partly automated industrial operations; installation of fire suppression systems; building construction services; building construction services, namely, building plumbing installation, plumbing installation advisory services, advisory services relating to the maintenance of plumbing; building construction supervision and managementACTIVE—
040Consulting in the field of alternative energy generation, manufacturing processes, automated manufacturing processesACTIVE—
042Consulting in the field of engineering; engineering consulting, specializing in design in the fields of mechanical engineering, electrical engineering, civil engineering, structural engineering, telecommunications engineering, computer networks, commercial and industrial automation and related controls engineering, communications networks engineering, and architectural design, architectural drafting, and computer systems integration; consulting services in the field of design and development of engineering processes, and manufacturing, and industrial processes being engineering processes; new product design consulting services; industrial design consulting servicesACTIVE—
045Fire prevention consultation; technical consultancy in the field of fire prevention and protection systems being fire prevention systems; physical security, namely, building security, low voltage securityACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 18, 2026ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Apr 18, 2026ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Jan 21, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jan 21, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 30, 2024SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Oct 30, 2024CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Sep 23, 2024DOCKASSIGNED TO EXAMINER—
Sep 17, 2024SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Sep 17, 2024AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Jul 15, 2024IUAFUSE AMENDMENT FILED—
Jul 15, 2024EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Jan 23, 2024NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Nov 28, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 28, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 8, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 26, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 29, 2023GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Apr 29, 2023GNSLLETTER OF SUSPENSION E-MAILED—
Apr 29, 2023CNSLSUSPENSION LETTER WRITTEN—
Apr 20, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 19, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 19, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 25, 2023GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 25, 2023GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 25, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 23, 2023DOCKASSIGNED TO EXAMINER—
Apr 28, 2022AMPXPRELIMINARY/VOLUNTARY AMENDMENT - ENTERED—
Apr 25, 2022ALIEASSIGNED TO LIE—
Apr 20, 2022PARITEAS VOLUNTARY AMENDMENT RECEIVED—
Apr 13, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 9, 2022NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance