Drawing for VERSIV

USPTO serial 97363464

VERSIV

Reviewed by CopyMark Law Group

Reg. 7402764Status 700Registered
Filing date
Status date
Registration date
May 28, 2024
Examiner
FOSDICK, GEOFFREY A
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with VERSIV?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Christine P. James

Christine P. James KILPATRICK TOWNSEND & STOCKTON LLP1100 Peachtree Street, Suite 2800Mailstop: IP Docketing - 22ATLANTA, GA 30309

Goods and services

ClassDescriptionStatusFirst use
037Construction, installation, laying, repair, refurbishment, modification and maintenance of pipes, pipelines, pipeline systems, and pipe couplings, gaskets, and connectors; pipe fitting services, namely, the connection of pipelines and repair of pipelines and connectors; construction of compressor stations, cross-compressor installations, plant facilities, pumping stations, and horsepower additions for pipelines and pipeline facilities; construction project management services in the field of pipeline construction, repair, and maintenance; construction project management services, namely, budgeting, constructability reviews, estimation and feasibility studies; construction dewatering, namely, the removal of surface waters and groundwater to facilitate the construction of pipelines; covering, coating, and maintenance of pipelines; under-water installation services, namely, underwater installation of pipelines and connectorsACTIVESep 30, 2021
039Information services, namely, providing information relating to the transportation and distribution of natural gas and fuels by pipelines and pipeline hubs; advisory services relating to transportation of fuels by pipeline and pipeline hubsACTIVESep 30, 2021
042Product research, design and development of pipes, pipelines, connectors, gaskets and couplings for pipeline systems for others; engineering services relating to pipelines, namely, the design of pipes, pipelines, connectors, gaskets, and couplings; electrical engineering; testing of apparatus in the field of electrical engineering; pipeline inspection servicesACTIVESep 30, 2021

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 6, 2026ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
May 28, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
May 28, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 22, 2024SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Apr 22, 2024CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Apr 5, 2024SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Apr 5, 2024AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Mar 15, 2024IUAFUSE AMENDMENT FILED—
Mar 15, 2024EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Sep 19, 2023NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jul 25, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 25, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 5, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jun 16, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 31, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 30, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 30, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 25, 2023XELGAPPLICATION EXTENSION GRANTED/RECEIPT PROVIDED—
Apr 25, 2023XELRAPPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED—
Feb 1, 2023GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 1, 2023GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 1, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 1, 2023DOCKASSIGNED TO EXAMINER—
Apr 20, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 18, 2022NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance