Drawing for VERTIVERSE

USPTO serial 97368485

VERTIVERSE

Reviewed by CopyMark Law Group

Status 606
Filing date
Status date
Registration date
—
Examiner
MONINGHOFF, KIM TERESA
Law office
INTENT TO USE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with VERTIVERSE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Lisa M. DuRoss

Lisa M. DuRoss HARNESS, DICKEY & PIERCE, P.L.C.5445 CORPORATE DRIVE, SUITE 200TROY, MI 48098United States

Goods and services

ClassDescriptionStatusFirst use
037installation, maintenance and repair of cooling systems; installation, maintenance and repair of data center cooling systems; installation, maintenance and repair of power generating, computer, and telecommunications equipment; installation, maintenance and repair of computer room air conditioning (CRAC) systems; installation, repair and maintenance of batteries; installation, repair and maintenance of power systems; installation, repair and maintenance fuel cells; installation, maintenance and repair of air-conditioning systems; installation, maintenance and repair of power generating apparatusACTIVE—
040custom manufacture of electrical power switches and controllers for computer and telecommunications network applications; custom manufacture of power generating apparatus; custom manufacture of power solutions for network applications; custom manufacture of power suppliesACTIVE—
041educational services, namely, conducting classes, conferences, seminars, and workshops in the field of power systems, air conditioning, personal access control, remote access products, and data center infrastructure management, and distribution of training material in connection therewith; training services in the fields of power systems, air conditioning, personal access control, remote access products, and data center infrastructure managementACTIVE—
042technical support services, namely, remote and on-site infrastructure management services for monitoring HVAC, electric, computer, and network systems to ensure proper functioning; computer monitoring service that tracks hardware performance and processes to ensure proper functioning and sends out historical reports and alerts; remote monitoring services of heating, ventilating and air conditioning apparatus; technical support, namely, monitoring technological functions of computer network systems; technical support, namely, monitoring performance and reliability of air conditioning systems to ensure proper functioning; engineering; engineering services for building and property condition assessment, facility management, repair and restoration and building instrumentation; battery monitoring and testing; consulting services in the field of design and engineering of electrical and battery back-up power systems for data centers, computer rooms and other commercial and industrial facilities; technological consultation and planning in the field of power supply systems for data centers and computer rooms; technological consultation and planning in the fields of cooling and climate control; technical consulting services in the fields of datacenter architecture and design of datacenter infrastructure and equipment; installation, maintenance, and repair of computer software; design of electrical and battery back-up power systems for computer and telecommunications network applications for others; engineering services, namely, technical project planning and design engineering for others in the fields of electrical and battery back-up power systems, computer networks and telecommunications projects; electrical engineering services, namely, providing technical analysis, testing, studies, recommendations and drafting plans in the field of safety, efficiency, performance and reliability of electrical equipment and power systems; engineering services in the field of electrical and battery back-up power systems and data center computer and telecommunications equipment engineering services; engineering services, namely, providing technical assessment of the performance, reliability, maintenance and configuration in the field of data center and commercial and industrial facility electrical and battery back-up power systems; engineering services, namely, providing technical assessment of the performance, reliability, maintenance and configuration in the field of data center cooling systems; remote monitoring of the functioning and use of data center and computer room electrical equipment, electrical and battery back-up power systems, and data center and computer room heating, ventilating and air conditioning apparatus; technical consultation in the fields of engineering of electrical and battery back-up power systemsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB6): The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.

DateCodeEventWhat it means
Dec 16, 2024MAB6ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Dec 16, 2024ABN6ABANDONMENT - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
May 7, 2024EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
May 6, 2024EX2GSOU EXTENSION 2 GRANTED—
May 6, 2024EXT2SOU EXTENSION 2 FILED—
May 6, 2024EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jan 24, 2024ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Nov 11, 2023EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Nov 9, 2023EX1GSOU EXTENSION 1 GRANTED—
Nov 9, 2023EXT1SOU EXTENSION 1 FILED—
Nov 9, 2023EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
May 9, 2023NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Mar 14, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 14, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 22, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 7, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 7, 2023XAECEXAMINER'S AMENDMENT ENTERED—
Feb 7, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Feb 7, 2023GNEAEXAMINERS AMENDMENT E-MAILED—
Feb 7, 2023CNEAEXAMINERS AMENDMENT -WRITTEN—
Feb 3, 2023DOCKASSIGNED TO EXAMINER—
May 12, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 21, 2022NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance