USPTO serial 97409737
MSG CONSTRUCTION SERVICES
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Aug 29, 2023
- Examiner
- BURKE, KELLY CHRISTINE
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with MSG CONSTRUCTION SERVICES?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
The Mannik & Smith Group, Inc.
Maumee, OH, US
The Mannik & Smith Group, Inc.
Maumee, OH, US
The Mannik & Smith Group, Inc.
Maumee, OH, US
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 042 | Engineering and habitat restoration design services in the field of wetland preservation; Engineering and hydrological design of restoration of stream channels, marshes, estuaries, and wetlands; Engineering design services; Engineering services in the field of energy efficiency; Engineering services in the fields of traffic and transportation; Engineering surveying; Civil engineering; Civil engineering drawing services; Civil infrastructure engineering services; Conducting feasibility studies in the field of environmental engineering; Drafting of plans and engineering drawings for others; Environmental engineering, testing and inspection services; Environmental services, namely, design for others in the field of environmental engineering; Environmental services, namely, technical consultation in the field of environmental science, engineering services and design for others in the field of environmental engineering; Geoenvironmental engineering; Geotechnical engineering; Hydrologic engineering services; Professional consulting services in the fields of engineering, land use planning, surveying, and environmental sciences; Structural engineering design services; Surveying and engineering; Traffic and transportation engineering | ACTIVE | Sep 15, 2020 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by The Mannik & Smith Group, Inc.
- Other trademarks owned by The Mannik & Smith Group, Inc.
- Other trademarks owned by The Mannik & Smith Group, Inc.
- Other trademarks in Class 042
- Similar marks named MSG CONSTRUCTION SERVICES
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 28, 2026 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| Aug 29, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Aug 29, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 13, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 13, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 24, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 11, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 21, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 20, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 20, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 21, 2022 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 21, 2022 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 21, 2022 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 14, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| May 19, 2022 | MDSC | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| May 18, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 17, 2022 | NWAP | NEW APPLICATION ENTERED | — |