USPTO serial 97424465
MONSTER
Reviewed by CopyMark Law Group
Status 732Notice of Allowance
- Filing date
- Status date
- Registration date
- —
- Examiner
- EVANKO, PATRICIA MALESARDI
- Law office
- INTENT TO USE SECTION
What this means
The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.
Need help with MONSTER?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $648*
Plus Government fees of $300
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Brisbane, CA, US
Brisbane, CA, US
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
MATTHEW POWELSON
MATTHEW POWELSON 321 LAW, INC.P.O. BOX 911MONTEREY, CA 93942United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Battery chargers; Electric vehicle battery chargers; charging stations for charging electric vehicles; bidirectional meters for electricity monitoring; networked communications devices for managing electrical outlets and meters, namely, local and wide-area wired or wireless modems and network interfaces; mounting brackets adapted for electric vehicle charging stations, covers for electrical outlets; Accumulator boxes; Battery boxes; Battery jump starters; Car batteries; Charging appliances for rechargeable equipment; Electric batteries for powering electric vehicles; Fuel cells; Lithium ion batteries; Photovoltaic cells; Photovoltaic cells and modules; Photovoltaic solar modules for production of electricity; Rechargeable batteries; Rechargers for electric accumulators; Renewable battery system to provide backup power; Solar-powered battery chargers; Solar batteries; Solar panels for the production of electricity; electric cables, power cables, electrical adapters, power adapters, electrical plugs, electrical outlets, electrical plug holders, covers for electrical outlets; downloadable application programming interface (API) software for developing software for operating charging stations for the charging of electric vehicles and other electric loads and related generating systems; downloadable app software for monitoring, optimizing, and regulating the charging of batteries | ACTIVE | — |
| 042 | SAAS for monitoring, optimizing and regulating the charging, storing, and use of battery power | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 29, 2026 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Sep 28, 2026 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Sep 28, 2026 | EXT3 | SOU EXTENSION 3 FILED | — |
| Sep 28, 2026 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Mar 26, 2026 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Mar 25, 2026 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Mar 25, 2026 | EXT2 | SOU EXTENSION 2 FILED | — |
| Mar 25, 2026 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Sep 26, 2025 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Sep 25, 2025 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Sep 25, 2025 | EXT1 | SOU EXTENSION 1 FILED | — |
| Sep 25, 2025 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Apr 1, 2025 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Feb 20, 2025 | TMBN | TTAB RELEASE CASE TO TRADEMARKS | — |
| Feb 20, 2025 | OP.T | OPPOSITION TERMINATED NO. 999999 | — |
| Feb 20, 2025 | OP.D | OPPOSITION DISMISSED NO. 999999 | — |
| Jan 17, 2024 | OP.I | OPPOSITION INSTITUTED NO. 999999 | — |
| Jan 17, 2024 | OPPF | OPPOSITION PAPERS RECEIVED AT TTAB | — |
| Dec 19, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 19, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 29, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Nov 15, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 14, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 14, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 14, 2023 | ALIE | ASSIGNED TO LIE | — |
| Jun 12, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 13, 2023 | GPRN | NOTIFICATION OF PRIORITY ACTION E-MAILED | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Mar 13, 2023 | GPRA | PRIORITY ACTION E-MAILED | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Mar 13, 2023 | CPRA | PRIORITY ACTION WRITTEN | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Mar 13, 2023 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Mar 13, 2023 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Mar 13, 2023 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Mar 13, 2023 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Mar 10, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| May 27, 2022 | MDSC | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| May 26, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 26, 2022 | NWAP | NEW APPLICATION ENTERED | — |