Drawing for C C

USPTO serial 97463527

C C

Reviewed by CopyMark Law Group

Reg. 8103451Status 700Registered
Filing date
Status date
Registration date
Jan 13, 2026
Examiner
FRUM MILONE,MARCIE R
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with C C?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Joshua M. Gerben, Esq.

1050 CONNECTICUT AVE NW, SUITE 500WASHINGTON, DC 20036United States

Goods and services

ClassDescriptionStatusFirst use
009ThermostatsACTIVEJun 11, 2008
011Air-conditioning, air cooling and ventilation apparatus and instruments; Geothermal-based HVAC units; Evaporators for air conditioners; Furnaces; Air purifying apparatus; Fibrous filtering media for general industrial use in the purification of air and industrial fluids; Electronic generator for use in controlling the amount of humidity in the air by creating, removing or circulating small water particles or water vapor in the air; Humidifiers; Humidifiers for household use; Energy recovery ventilatorsACTIVEJun 11, 2008
037Air conditioning contractor services; Air duct cleaning services; Basement waterproofing; Boiler cleaning and repair; Building construction services; Building construction supervision; Building construction, remodeling and repair; Building maintenance and repair; Building sealing and caulking services; Electrical contracting; Electrical contractor services; Heating contractor services; Heating equipment installation and repair; Home energy assessment services for the purpose of determining home improvements needed to improve energy use and efficiency; HVAC contractor services; Installation and maintenance of solar energy based power plants; Installation and maintenance of solar thermal installations; Installation and repair of air conditioning apparatus; Installation and replacement service for heating, ventilating and air conditioning systems; Installation and replacement service for water heaters; Installation of geothermal energy based power plants; Installation, repair and maintenance of condensing apparatus, steam condensers, radiators for motors and engines, air reheaters, boiler tubes; Installation, repair and maintenance of heating equipment; Maintenance and repair of heating installations; Mechanical contractor services; Plumbing; Plumbing and gas and water installation; Plumbing contractor services; Plumbing services; Repair and installation services, namely, the installation of heating, cooling and environmental control systems primarily using solar energy, renewable energy resources and rainwater; Repair or maintenance of boilers; Repair or maintenance of gas water heatersACTIVEJun 11, 2008

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 13, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jan 13, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 22, 2025SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Dec 22, 2025CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Dec 19, 2025SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Dec 19, 2025AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Jun 18, 2025IUAFUSE AMENDMENT FILED—
Jun 18, 2025EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Mar 3, 2025EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Dec 24, 2024EX3GSOU EXTENSION 3 GRANTED—
Dec 23, 2024EXT3SOU EXTENSION 3 FILED—
Dec 23, 2024EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jun 13, 2024EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
May 31, 2024EX2GSOU EXTENSION 2 GRANTED—
May 31, 2024EXT2SOU EXTENSION 2 FILED—
May 31, 2024EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Dec 13, 2023EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Dec 11, 2023EX1GSOU EXTENSION 1 GRANTED—
Dec 11, 2023EXT1SOU EXTENSION 1 FILED—
Dec 11, 2023EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jun 27, 2023NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
May 2, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 2, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 12, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 29, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 29, 2023XAECEXAMINER'S AMENDMENT ENTERED—
Mar 29, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Mar 29, 2023GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 29, 2023CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 29, 2023DOCKASSIGNED TO EXAMINER—
Jul 6, 2022MDSMNOTICE OF DESIGN SEARCH CODE E-MAILED—
Jul 5, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 21, 2022NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance