Drawing for TERRASPACE

USPTO serial 97467491

TERRASPACE

Reviewed by CopyMark Law Group

Status 606
Filing date
Status date
Registration date
—
Examiner
RENNEKER, CHRISTOPHER JOHN
Law office
INTENT TO USE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with TERRASPACE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Judith Szepesi

Judith Szepesi NICHOLSON DE VOS WEBSTER & ELLIOTT LLP99 ALMADEN BLVD, SUITE 575SAN JOSE, CA 95113United States

Goods and services

ClassDescriptionStatusFirst use
035Operation of tunnels and underground structures for others; Business management of tunnels and underground structures for others; Providing of underground tunnels as a service, namely operation of underground tunnels for others; Business management of tunnels for transportation; Business management of tunnels for energy storage; Leasing of tunnels; Business management of utility tunnels; Business management of tunnels for power lines, fiber, and pipelines; Business management of tunnels for water conveyance; Business management of tunnels for delivery and transportation; Operation of large diameter utility tunnels; Operation of large diameter tunnels for storage of sensitive equipment to protect it from EMP or solar storm activity; Operation of large diameter tunnels for underground real estate; Operation of large diameter tunnels for offices; Operation of large diameter tunnels for storage; Operation of large diameter tunnels for manufacturing; Operation of large diameter tunnels for housing; Business management of subsurface real estateACTIVE—
036Real estate management of underground tunnels for utilities; Real estate management of underground tunnels for storage; Real estate management of underground tunnels for manufacturing; Real estate management of underground tunnels for housing; Leasing of real estate, namely, underground structuresACTIVE—
042Design of tunnels and underground structures; Providing temporary use online non-downloadable software for management, control, mapping, operation, and leasing of tunnels, subsurface real estate, and underground structures; Engineering design services in the field of construction; Engineering system analysis; Technical advice and technical assistance, namely, engineering services in the field of utility tunnel design and maintenance; Structural analysis and expertise services for the design and construction of underground utility tunnels; Providing temporary use online non-downloadable software for design, management, and operation of tunnels; Providing temporary use non-downloadable software for management of underground real estate; Design and management of underground real estate; Providing temporary use non-downloadable software for operation, and leasing of tunnels, subsurface real estate, and underground structuresACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB6): The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.

DateCodeEventWhat it means
Aug 24, 2026MAB6ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Aug 24, 2026ABN6ABANDONMENT - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Jan 22, 2026EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jan 21, 2026EX4GSOU EXTENSION 4 GRANTED—
Jan 21, 2026EXT4SOU EXTENSION 4 FILED—
Jan 21, 2026EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jul 23, 2025EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jul 22, 2025EX3GSOU EXTENSION 3 GRANTED—
Jul 22, 2025EXT3SOU EXTENSION 3 FILED—
Jul 22, 2025EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jan 31, 2025EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jan 30, 2025EX2GSOU EXTENSION 2 GRANTED—
Jan 17, 2025EXT2SOU EXTENSION 2 FILED—
Jan 17, 2025EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jul 24, 2024EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jul 22, 2024EX1GSOU EXTENSION 1 GRANTED—
Jul 22, 2024EXT1SOU EXTENSION 1 FILED—
Jul 22, 2024EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jan 23, 2024NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Nov 28, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 28, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 8, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 17, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 12, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 11, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 11, 2023ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jul 12, 2023GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Jul 12, 2023GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 12, 2023CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 11, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 10, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 10, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 10, 2023GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 10, 2023GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 10, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 30, 2023DOCKASSIGNED TO EXAMINER—
Mar 21, 2023AMPXPRELIMINARY/VOLUNTARY AMENDMENT - ENTERED—
Mar 21, 2023ALIEASSIGNED TO LIE—
Jan 5, 2023PARITEAS VOLUNTARY AMENDMENT RECEIVED—
Jul 7, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 23, 2022NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance