USPTO serial 97467500
ATLAS
Reviewed by CopyMark Law Group
Status 606
- Filing date
- Status date
- Registration date
- —
- Examiner
- RENNEKER, CHRISTOPHER JOHN
- Law office
- INTENT TO USE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with ATLAS?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Richmond, CA, US
Berkeley, CA, US
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Judith Szepesi
Judith Szepesi NICHOLSON DE VOS WEBSTER & ELLIOTT LLP99 ALMADEN BLVD, SUITE 575SAN JOSE, CA 95113United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Tunnel boring machines; Industrial drilling robots; Trenchless tunnel boring machines; Plasma cutting machines; Electric plasma arc cutters; Tunnel drilling machines; Underground drilling equipment; Underground drilling machines; Tools for underground drilling, namely, plasma cutting machines; Drilling machines; Boring machines; Earth boring machines; Industrial boring robots; Rock drilling machines; Large diameter tunneling machines; none of the foregoing for use in connection with fracking or oil and natural gas extraction | ACTIVE | — |
| 037 | Construction and construction management of tunnels and underground structures; Consulting in the field of construction and construction management of tunnels and underground structures; Providing information about construction of tunnels and underground structures; Construction of civil engineering structures underground; Construction of underground boring tunnels; Construction management of tunnels for others; Construction and excavation services, namely, directional drilling, tunneling and earth boring; Directional drilling, tunneling and earth boring tunnels for utilities; Directional drilling, tunneling and earth boring for power lines, fiber, pipelines, and transportation uses; Construction services, namely, underground drilling of tunnels and underground structures; Construction of underground utility lines; Power construction services; Construction management of tunnels and underground structures for others; Underground boring as a service; Construction of large diameter tunnels; Construction and construction management of large diameter utility tunnels; Construction and excavation services, namely, rock drilling; Trenchless tunnel construction services; Directional drilling of tunnels; Lining the interior of a tunnel by applying a fluid impervious barrier; Pipeline construction and pipeline installation; Plumbing services, namely, installing, repairing, and replacing sewer pipes, water pipes, and gas pipes using directional drilling methods; Inspection services in the course of construction of utility tunnels; none of the foregoing for use in connection with fracking or oil and natural gas extraction | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 8, 2026 | MAB6 | ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Jun 8, 2026 | ABN6 | ABANDONMENT - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Oct 31, 2025 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Oct 30, 2025 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Oct 30, 2025 | EXT3 | SOU EXTENSION 3 FILED | — |
| Oct 30, 2025 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Apr 30, 2025 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Apr 30, 2025 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Apr 29, 2025 | EXT2 | SOU EXTENSION 2 FILED | — |
| Apr 29, 2025 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Oct 23, 2024 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Oct 23, 2024 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Oct 23, 2024 | EXT1 | SOU EXTENSION 1 FILED | — |
| Oct 23, 2024 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| May 7, 2024 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Mar 28, 2024 | CHPB | POST PUBLICATION AMENDMENT - ENTERED | — |
| Mar 26, 2024 | APET | ASSIGNED TO PETITION STAFF | — |
| Feb 22, 2024 | ETOP | EXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED | — |
| Feb 21, 2024 | EPPA | TEAS POST PUBLICATION AMENDMENT RECEIVED | — |
| Sep 13, 2023 | ETOF | EXTENSION OF TIME TO OPPOSE RECEIVED | — |
| Aug 15, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Aug 15, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 26, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 10, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 7, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 6, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 6, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 6, 2023 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 6, 2023 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 6, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 30, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 21, 2023 | AMPX | PRELIMINARY/VOLUNTARY AMENDMENT - ENTERED | — |
| Mar 21, 2023 | ALIE | ASSIGNED TO LIE | — |
| Jan 5, 2023 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |
| Jul 7, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 23, 2022 | NWAP | NEW APPLICATION ENTERED | — |