Drawing for TQP

USPTO serial 97474551

TQP

Reviewed by CopyMark Law Group

Reg. 7672082Status 700Registered
Filing date
Status date
Registration date
Jan 28, 2025
Examiner
BERLIN, JUSTIN E
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with TQP?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Robin W. Asher

Robin W. Asher MILLER CANFIELD150 W. JEFFERSON AVENUESUITE 2500DETROIT, MI 48226

Goods and services

ClassDescriptionStatusFirst use
006Metal couplings, namely, jaw type, pin type, bushing type, elastomeric, chain and coupling inserts for industrial, automotive and agricultural machines; Metal machine parts, namely, knife guards, combine guards, cutter guards, swather guards, windrower guards, mover guards, cast forged steel and malleable guardsACTIVEAug 27, 2024
007Belts for machines, namely, v-belts, FHP belts, classical belts, ABCDE belts, 3V-5V-8V belts, 3L-4L-5L belts, baler belts, combine drive belts, variable speed belts, timing belts, multiple belts, conveyor belts, double section belts, hex belts, round belts, detachable belts, wedge belts, belts for agricultural machines, poly V belts, V-ribbed belts, banded belts, open end belts, raw edge belts, cogged belts, notched belts, synchronous belts, belts for industrial machines, belts for automotive machines, oilfield belts, elevator belts, and rough top belts; Machine parts in the nature of riveted roller chains, cottered chains, solid roller chains, multi stranded chains, heavy chains, extended pitch chains, round baler chains, chain links connector, offset chains, roller chains, steel detachable chains, pintle chains, t-bar manure chains; Machine parts in the nature of bearings, namely, ball bearings, roller bearings, spherical bearings, taper roller bearings, agricultural bearings, discer bearings, automotive bearings, wheel bearings, taper roller bearing sets, standard bearings, precision bearings, bronze bearings, locking collars bearings, pillow and flange block housings and ASSTS bearings, pressed steel housing bearings, hex bore bearings, bearings, bearing inserts, bearing adaptors, light medium and heavy duty bearings, needle bearings, cam follower bearings, greaseable bearings, sealed bearings, swather roller bearings, trailer bearings; Machine parts in the nature of mechanical seals, namely, shaft seals, seals for industrial machines, seals for automotive machines, seals for agricultural machines, inch and metric seals, O-rings, O-ring cord, hub seals; pulleys being parts of machines, namely, idler pulleys, V-groove pulleys, flat belt pulleys, cast pulleys, pressed steel pulleyrs, die cast pulleys, FHP pulleys, classical pulleys, ABC section pulleys, bushing type pulleys, fixed bore type pulleys, weld-on pulleys, single and multiple groove pulleys; sprockets being parts of machines, namely, idler type sprockets, roller chain sprockets, single double and triple type sprockets,sprockets of agricultural machines, weld-on sprockets, cast sprockets, extended pitch sprocketsACTIVEAug 27, 2024
035Wholesale distributorship services featuring 3-point parts, accessories, bearings, agricultural belts, V-belts, bolts, canvas, air tools, contour buddy, chains, concaves, consumer products, industrial products, industrial air tools, conveyor parts, compressor parts, cutting parts, combine parts, direct shipments, disc blades, drill parts, electronics, gear boxes, general hand tools, ground maintenance products and parts, guards, hardware, hay equipment, HCC parts, hoppers, hydraulic hose, hubs, wheels, hydraulics, industrial hydraulics, jacks, lacing, lacers, lights, lubes, fittings, swather parts, sweeps, reel parts, pick-up parts, mufflers, hay rake parts, plow parts, precision metal fabrics, pto parts, sheaves, sprockets, seals, O-rings, special harvest items, sprayer parts, sprayers, shanks, tines, teeth, reels, shop equipment, tools, hand tools, shop suppliesACTIVEAug 27, 2024

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 28, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jan 28, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 7, 2025SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Jan 7, 2025CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Nov 13, 2024SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Nov 13, 2024AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Sep 12, 2024IUAFUSE AMENDMENT FILED—
Sep 12, 2024EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Mar 13, 2024EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Mar 12, 2024EX1GSOU EXTENSION 1 GRANTED—
Mar 12, 2024EXT1SOU EXTENSION 1 FILED—
Mar 12, 2024EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Sep 12, 2023NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jul 18, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 18, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 28, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jun 10, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 10, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 9, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 9, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 8, 2023GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 8, 2023GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 8, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 17, 2023ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
May 9, 2023PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Apr 21, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 20, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 19, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 19, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 14, 2023GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 14, 2023GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 14, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 7, 2023DOCKASSIGNED TO EXAMINER—
Jul 14, 2022MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Jul 13, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 28, 2022NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance