Drawing for CMSCOMPACT

USPTO serial 97486455

CMSCOMPACT

Reviewed by CopyMark Law Group

Reg. 7257720Status 700Registered
Filing date
Status date
Registration date
Jan 2, 2024
Examiner
NASSERGHODSI, SAHAR
Law office
TMO LAW OFFICE 115

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with CMSCOMPACT?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Catherine F. Hoffman

Catherine F. Hoffman Baker, Donelson, Bearman, Caldwell, & Berkowitz, PC200 East Broward Blvd, Suite 2000FT. LAUDERDALE, FL 33301United States

Goods and services

ClassDescriptionStatusFirst use
009Industrial automation controls; industrial condition monitoring systems for machines and installations comprising temperature sensors, electric sensors, vibration sensors, optical sensors, acceleration sensors and inductive sensors; electrical measuring and protection systems comprising electric sensors for power supply networks and power engineering installations; electrical control systems comprising semiconductor devices for power generation installations and power supply networks; computer display screens for the visualization of machine controls; power supply units for the power supply of control systems; digital and/or optical bus fiber connectors for the networking of servo systems and drives for machines and installations; diagnostic and monitoring units in the nature of electric sensors with visual display on a screen for the input and process control of controls for machines and installations; electronic and optical communication links for connecting machines and installations and controls; downloadable software for creating sequence programs for machines and installations; downloadable industrial automation software for controlling and tracking problems of power generation installations; downloadable software for industrial condition monitoring of machines and installations; downloadable software for measuring and protecting power supply networks and power engineering installations; downloadable software for regulating power generation installations and power supply networksACTIVE—
042Development of industrial automation controls, industrial condition monitoring systems for machines and installations, electrical measuring and protection systems for power supply networks and power engineering installations, electrical control systems for power generation installations and power supply networks; development of terminals for the visualization of machine controls; development of visualization systems; development of power supply units for the power supply of control systems; development of digital and/or optical bus connections for the networking of servo systems and drives for machines and installations; development of diagnostic and monitoring units with visual display on a screen for the input and process control of controls for machines and installations; development of electronic and optical communication links for the connection of machines and installations and controls; development of software for the creation of sequence programs for machines and installations; development of software for industrial automation systems; development of software for industrial condition monitoring of machines and installations, development of software for measuring and protecting power supply networks and power engineering installations; development of software for regulating power generation installations and power supply networks; development of visualization softwareACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 15, 2024TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Apr 15, 2024ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 15, 2024REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Apr 15, 2024CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Apr 15, 2024COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Jan 2, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jan 2, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 17, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 17, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 27, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 11, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 11, 2023XAECEXAMINER'S AMENDMENT ENTERED—
Sep 11, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Sep 11, 2023GNEAEXAMINERS AMENDMENT E-MAILED—
Sep 11, 2023CNEAEXAMINERS AMENDMENT -WRITTEN—
Sep 5, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 5, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 5, 2023ALIEASSIGNED TO LIE—
Apr 20, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 26, 2023GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 26, 2023GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 26, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 23, 2023DOCKASSIGNED TO EXAMINER—
Jul 21, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 5, 2022NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance