Drawing for GWH

USPTO serial 97488653

GWH

Reviewed by CopyMark Law Group

Reg. 7132642Status 700Registered
Filing date
Status date
Registration date
Aug 8, 2023
Examiner
LEVINE, HOWARD B
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with GWH?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
019Bamboo flooring; Bitumen based compositions for building purposes; Building materials, namely, manufactured brick veneer for use on interior and exterior walls, floors and surfaces, patios, poolsides and driveways; Ceramic bricks for use in refractory furnaces; Chicken coops; Concrete building materials, namely, blocks, bricks, posts, slabs, panels; Decorative centerpieces of stone, concrete, marble; Desktop statuary made of stone, concrete,marble; Interlocking plastic tiles for use as a ground cover; Mantels for fireplaces of wood, plaster, stone; Non-metal decks; Non-metal mantels for fireplaces; Non-metal tiles; Nonmetal door parts for buildings, namely, adjusters for adjusting the height of a door, floor boards, columns, beams, paneling boards, sills, sleepers, backings for ceilings or walls, stiles, rails and ceiling boards; Polyethylene pipe used in geothermal heating and cooling systems; Raw and coated chip boards for the building industry, furniture and interior decorating; Rigid pipes of polypropylene for the supply of drinking water and heating and air conditioning systems in houses, office buildings and industrial buildings; Shaped timber; Sheathing board; Stone for carving mantels, columns and banisters; Tile floorings, not of metal; Tiles and paving slabs, not of metal; Tiles of ceramic for wall, floor or ceiling; Tiles, not of metal; Tiles, not of metal, for building; Timber boarding; Waterproof membrane for use as a floor underlayment; Wood blocks; Wood joists; Wood panelling; Wood tile floors; Wood veneers; Wood veneers for arts and crafts; Wooden building materials, namely, boards, decking, railings; Wooden floor boards; Wooden flooring; Wooden railings; Wooden tiles; Wooden veneers; Works of art of stone, concrete, marble, clayACTIVEJun 22, 2020

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 8, 2023NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Aug 8, 2023R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 23, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 23, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 3, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 19, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 19, 2023DOCKASSIGNED TO EXAMINER—
Jul 24, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 8, 2022NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance