USPTO serial 97497967
BOBCAT
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Mar 17, 2026
- Examiner
- WHELAN, JAIME M
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with BOBCAT?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
West Fargo, ND, US
DOOSAN BOBCAT NORTH AMERICA INC.
WEST FARGO, ND, US
DOOSAN BOBCAT NORTH AMERICA, INC.
WEST FARGO, ND, US
DOOSAN BOBCAT NORTH AMERICA, INC.
WEST FARGO, ND, US
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Tiffany Eisenbise
Tiffany Eisenbise Doosan Bobcat North America, Inc.250 East Beaton Drive7000 Central ParkwayWest Fargo, ND 58078Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Power-operated machines and tools for treating and maintaining lawn, turf and grounds, namely, sod rollers, sod cutters, sod loaders, sod spikers, sod splicers, sod corkers, sod renovators, sod and turf tillers, sod lawn sweepers, sod and lawn feeders, sod and lawn de-thatchers, sod and turf trenchers, sod and lawn vertical mowers, underground pipe and wire installers, sod and turf aerating core removers, sod and turf top-dressing levelers, sod and turf equipment trailers, sod and turf cultivators, sod and turf edgers, and sod and turf strippers; lawn mowers; grass cutting machines, aerators, and grounds maintenance machine parts, namely, earth moving and grooming blades, rakes, scoops, tillers, augers, leaf blowers, snow blowers, sweepers, chippers, shredders, edgers, front end loaders, stump cutters, trenchers, power operated liquid fertilizer and insecticide sprayers, pallet movers, detachable grass clipping receptacles, and structural and replacement parts for all the aforesaid goods included in this class; excavating machines; stone and rock picking machines in the nature of raking machines used for clearing land by collecting and picking up loose stones and rocks; attachments for earth moving machines, namely, buckets, hooks, spades, grabs, crushers used for crushing cement and rebar, quick couplers in the nature of couplers used for connecting attachments to earth moving machines, rippers used for excavating hard ground materials and demolition, excavator bucket thumbs, and parts and fittings thereof; power-operated machines and tools for the construction industry and environmental field, namely, soil compactors, asphalt compactors, rammers, vibratory plate compactors, vibratory drum rollers, vibratory tandem rollers, vibratory self-propelled rollers and structural and replacement parts for all the aforesaid goods included in this class; autonomous, semi-autonomous, and remote-controlled earth moving, construction, and agricultural machines, namely, bulldozers, excavators, front-end loaders, backhoe loaders, skid-steer loaders, telehandlers, telescopic material handling machines, track loaders, loading-unloading machines and replacement parts therefor; Electrically-powered earth moving, construction, and agricultural machines, namely, excavators, front-end loaders, skid-steer loaders, track loaders, loading-unloading machines and replacement parts therefor; attachments for power construction and agricultural machines, namely, augers and auger teeth, backhoes, bale forks, boring units, box blades, breakers and breaker bits, brooms, buckets, chippers, clamps, compactors, cutters, diggers, dozer blades, drop hammers, fence installers, graders, grading blades, grapples, hoppers, landplanes, mowers, packer wheels, pallet forks, planers, plows, rakes, rippers, rollers, saws, scarifiers, scrapers, seeders, snow blades, snow blowers, snow pushers, sod layers, soil conditioners, sprayers, spreaders, stump grinders, sweepers, tillers, tilt carriages, tree spades, trench compactors, trenchers, truss booms, utility blades, and utility forks; rubber tracks for construction and agricultural machinery; machine parts, namely, hydraulic fluid filters, oil filters, fuel filters and air filters; remanufactured internal combustion engines, starter motors and alternators for land vehicles; machine parts, namely, couplers of synthetic material; bristles for power-operated brushes and sweepers; high pressure washers; vibratory plate compactors; power-operated rammer machines; filters and purifiers for machines, namely, purifiers for removing contaminants from the exhaust gasses emitted from machines | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Clark Equipment Company
- Other trademarks owned by DOOSAN BOBCAT NORTH AMERICA INC.
- Other trademarks owned by DOOSAN BOBCAT NORTH AMERICA, INC.
- Other trademarks owned by DOOSAN BOBCAT NORTH AMERICA, INC.
- Other trademarks in Class 007
- Similar marks named BOBCAT
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 26, 2026 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Aug 26, 2026 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 26, 2026 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Aug 26, 2026 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Aug 26, 2026 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Mar 17, 2026 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Mar 17, 2026 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Feb 25, 2026 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Feb 25, 2026 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Feb 20, 2026 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Feb 6, 2026 | IUAF | USE AMENDMENT FILED | — |
| Feb 6, 2026 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Jan 22, 2026 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jan 22, 2026 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jan 21, 2026 | NOAC | CORRECTED NOA E-MAILED | — |
| Jan 21, 2026 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Jan 21, 2026 | DPCC | DIVISIONAL PROCESSING COMPLETE | — |
| Jan 20, 2026 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Aug 7, 2025 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Aug 6, 2025 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Aug 6, 2025 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Aug 5, 2025 | EXT3 | SOU EXTENSION 3 FILED | — |
| Jun 28, 2025 | IROA | RESPONSE TO ITU OFFICE ACTION ENTERED | — |
| Jun 28, 2025 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 18, 2025 | INCD | ITU OFFICE ACTION ISSUED FOR DIVISIONAL REQUEST | — |
| Jun 18, 2025 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Feb 6, 2025 | DRRR | DIVISIONAL REQUEST RECEIVED | — |
| Feb 6, 2025 | EXT2 | SOU EXTENSION 2 FILED | — |
| Feb 6, 2025 | ERTD | TEAS REQUEST TO DIVIDE RECEIVED | — |
| Feb 6, 2025 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Feb 6, 2025 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Aug 6, 2024 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Aug 6, 2024 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Aug 6, 2024 | EXT1 | SOU EXTENSION 1 FILED | — |
| Aug 6, 2024 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Feb 6, 2024 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Dec 13, 2023 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| Dec 12, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 12, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 22, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Nov 8, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 12, 2023 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 12, 2023 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 12, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 4, 2023 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Sep 9, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 8, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 8, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 9, 2023 | XELG | APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED | — |
| Jun 9, 2023 | XELR | APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED | — |
| Mar 10, 2023 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 10, 2023 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 10, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 3, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 20, 2023 | TAEA | TEAS AMENDMENT ENTERED BEFORE ATTORNEY ASSIGNED | — |
| Jan 20, 2023 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |
| Jul 29, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 14, 2022 | NWAP | NEW APPLICATION ENTERED | — |