Drawing for CENNATIC

USPTO serial 97524108

CENNATIC

Reviewed by CopyMark Law Group

Reg. 7381924Status 700Registered
Filing date
Status date
Registration date
May 7, 2024
Examiner
COHEN, ROBERT ANDREW
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with CENNATIC?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
009Electric control devices for energy management; solar panels for electricity generation; power distribution system, namely, power distribution panels; electric power supply units; electrical wires and cables used in Electrical circuit, Electrical batteries, battery chargers, current converters and inverters, Photo-voltaic cells, Solar panels and batteries for generating electricity; Electric and electronic computers for operating wind turbines, wind power plants and other wind-powered machines; Electronic sensors for checking and monitoring the operation of energy generating apparatus, including the powering up and power down of generators after a general power failure or surge, operation of surge protectors during lightning events; Electronic sensors for wind turbines for monitoring constant voltage regulation, frequency, phase state, rotor speed, brake pad operation, temperature, wind direction and wind speed, vibration; Electric wattage-hour meters; Microprocessors for controlling wind turbines and monitoring their constant voltage, frequency, phase conditions, rotor speed, efficiency and thickness of brake pads, and also for monitoring temperature, wind direction and wind speed; Test stations for hydrogen generators; Solar cells; Solar cell plates being photovoltaic cells; Solar cell panels for generating electricity; Wafers for solar cells; Crystalline silicon solar cells; Solar thermal modules; Photovoltaic solar modules for producing electricity; Apparatus for converting electronic radiation to electrical energy, namely, photovoltaic solar hybrid modules; Wind turbine controller; Electrolysis apparatus for laboratory use; Electric power distribution machines; Electrical distribution systems, namely, power distribution panels; Charging stations for electric vehicles; Electrical, electronic and computer equipment for wind mills, wind power plants, wind turbines and other wind-operated machines, namely, computers, computer hardware, and electrical controllers; electronic controllers and monitors for automatically turning on or off the generator and for automatic restarting after public power line break-downs; apparatus for overvoltage protection against strokes of lightning, namely, voltage surge protectors and electrical arrestors for overvoltage protection against lighting strikes; structural and replacement parts for all the aforesaid goodsACTIVESep 1, 2023

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 7, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
May 7, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 4, 2024SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Apr 3, 2024CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Mar 6, 2024SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Mar 6, 2024AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Feb 14, 2024IUAFUSE AMENDMENT FILED—
Feb 14, 2024EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Sep 26, 2023TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Sep 26, 2023CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Sep 26, 2023COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Aug 22, 2023NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jun 27, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jun 27, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 7, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
May 23, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 23, 2023XAECEXAMINER'S AMENDMENT ENTERED—
May 23, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
May 23, 2023GNEAEXAMINERS AMENDMENT E-MAILED—
May 23, 2023CNEAEXAMINERS AMENDMENT -WRITTEN—
May 15, 2023DOCKASSIGNED TO EXAMINER—
Aug 19, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 1, 2022NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance