Drawing for OVERLAND CONVEYOR COMPANY

USPTO serial 97537306

OVERLAND CONVEYOR COMPANY

Reviewed by CopyMark Law Group

Reg. 8113151Status 700Registered
Filing date
Status date
Registration date
Jan 27, 2026
Examiner
DUBIN, DAVID I
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with OVERLAND CONVEYOR COMPANY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Gary W. Donohue

Gary W. Donohue Dinsmore & Shohl LLP900 Wilshire DriveSuite 300Troy, MI 48084

Goods and services

ClassDescriptionStatusFirst use
009Downloadable software for conveyor design and analysis being belt conveyor design, simulation of conveyor startup and shutdown, testing of conveyor control logic, analyzing and visualizing bulk flow of material, predicting problematic operating conditions, analyzing idler rollers, analyzing feeders, analyzing pipe conveyors, analyzing belt stiffness, developing conveyor routes, and estimating conveyor costsACTIVEAug 31, 1996
035Business consultation services in the field of developing budgets used in the mining industry, field of budgetary studies used in the mining industry, and field of technology trade studies; none of the aforementioned services including or provided in the fields of workers’ compensation account auditing and billingACTIVEAug 31, 1996
037Repair or maintenance of conveyors; consulting services in the field of physical maintenance of conveyors; belt tension analyses being consulting in the field of mining extraction of metals; design audits being consulting in the field of mining extraction of metals; conveyor design risk analyses being consulting in the field of mining extraction of metals; material flow analyses being consulting in the field of mining extraction of metals; conveyor diagnostics being consulting in the field of mining extraction of metals; failure analyses being consulting in the field of mining extraction of metals; finite element analyses being consulting in the field of mining extraction of metals; maintenance evaluations being consulting in the field of mining extraction of metals; feeder analyses being consulting in the field of mining extraction of metals; none of the aforementioned services used in the field of computer data storage hardwareACTIVEAug 31, 1996
041Training services in the field of use and operation of computer software for the design and analysis of conveyors; training services in the field of use and operation of conveyers; arranging and conducting of training workshops in the field of conveyor design, operation, safety, evaluation, component selection, conveyor lifespan, and optimization; training in the use and operation of conveyersACTIVEAug 31, 1996
042Engineering services in the field of conveyors being conveyor design, conveyor chute design, conveyor transfer chute design, conveyor pulley design, design optimization, commissioning conveyors, and conveyor control programming; software as a service (SAAS) services featuring software for conveyor design and analysis being belt conveyor design, simulation of conveyor startup and shutdown, testing of conveyor control logic, analyzing and visualizing bulk flow of material, predicting problematic operating conditions, analyzing idler rollers, analyzing feeders, analyzing pipe conveyors, analyzing belt stiffness, developing conveyor routes, and estimating conveyor costs; conducting scientific feasibility studies; diagnostic services in the fields of conveyors being machines, belt conveyors and, aerial conveyors; testing, analysis, and evaluation of conveyor belts in the field of belt friction to determine conformity with certification standards; testing, analysis, and evaluation of conveyor belts in the field of belt stiffness to determine conformity with certification standards; testing, analysis, and evaluation of conveyor belts in the field of idler roll drag to determine conformity with certification standards; power consumption analyses, namely, metering and monitoring electric power consumption by third parties for electric power providers; mine simulations, namely, design of computer-simulated models; none of the aforementioned services used in the fields of pharmaceuticals, biotechnology, and medicineACTIVEAug 31, 1996

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 27, 2026NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jan 27, 2026R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 9, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Dec 9, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 3, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Nov 6, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 6, 2025XAECEXAMINER'S AMENDMENT ENTERED—
Nov 6, 2025GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Nov 6, 2025GNEAEXAMINERS AMENDMENT E-MAILED—
Nov 6, 2025CNEAEXAMINERS AMENDMENT -WRITTEN—
Oct 13, 2025RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Apr 10, 2025RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Oct 9, 2024GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Oct 9, 2024GNSLLETTER OF SUSPENSION E-MAILED—
Oct 9, 2024CNSLSUSPENSION LETTER WRITTEN—
Sep 27, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 27, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 27, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 21, 2024XELGAPPLICATION EXTENSION GRANTED/RECEIPT PROVIDED—
Jun 21, 2024XELRAPPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED—
Mar 28, 2024GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 28, 2024GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 28, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 29, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 28, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 28, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 20, 2023ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Nov 8, 2023ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Oct 2, 2023XELGAPPLICATION EXTENSION GRANTED/RECEIPT PROVIDED—
Oct 2, 2023XELRAPPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED—
Oct 2, 2023TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Oct 2, 2023ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Oct 2, 2023ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 2, 2023REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jul 1, 2023GPRNNOTIFICATION OF PRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Jul 1, 2023GPRAPRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Jul 1, 2023CPRAPRIORITY ACTION WRITTENA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
May 23, 2023DOCKASSIGNED TO EXAMINER—
Aug 30, 2022MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Aug 27, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 9, 2022NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance